Construction fall / overhead protection — ECB/OATH summons 39556284H
Normalized ten-character lookup: 039556284H (infraction 2P7)
Source allegation and actual cited law
The allegation concerns guardrails, open edges, falling-material exposure or overhead/roof protections during construction. Key locations/components named in the source: roof or rooftop.
Inspector narrative as preserved in source data — potentially incomplete
NOTE: AT TIME OF INSPECTION, I OBSERVED ROOF PROTECTION INSTALLED AT ADJOINING PROPERTIES AT EXPOSURE#2, UPON SPEAKING WITH THE ADJOINING PROPERTIES I WAS INFORM THAT THERE WERE NO LICENSE/AGREEMENT TO ENTER TH
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2P7
- Issue date
- July 7, 2026
- Service date
- July 7, 2026
- Source severity
- CLASS - 2
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 99 5 Avenue, Manhattan, NY 10003
Identify the cited exposure, elevation, work phase and missing or defective protective measure in the inspector narrative. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “NOTE: AT TIME OF INSPECTION, I OBSERVED ROOF PROTECTION INSTALLED AT ADJOINING PROPERTIES AT EXPOSURE#2, UPON SPEAKING WITH THE ADJOINING PROPERTIES I WAS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039556284H.
- Whether the described guardrail, overhead cover or other protective system was absent or inadequate on that date
- Whether engineered protection drawings and installation records cover the cited area
- Whether the cited work phase or affected neighboring area is accurately identified
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Correct urgent fall or struck-by hazards with competent construction-site safety supervision.
- Have qualified professionals verify guardrails or engineered protection where needed and retain dated photos, inspection logs and any required agency sign-off.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- dated roof photographs and any roofing/equipment permit documents
- site safety plan and engineered protection details
- dated photographs tied to the specific exposure and floor
- guardrail, netting or overhead-cover installation and inspection records
- contractor corrective work logs and any adjacent-property access records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.