NYC DOB / ECB / OATH hearings · verified property resolution

10-38 45 Avenue, Queens, NY 11101 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 10-38 45 Avenue, Queens, NY 11101 and source-listed date December 29, 2026. Recorded concerns include facade / exterior wall safety, fire escape / exit obstruction, site safety / construction operations and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safetyFire escape / exit obstructionSite safety / construction operationsWork contrary to approved plans

Verified premises, hearing and enforcement snapshot

Verified premises address
10-38 45 Avenue, Queens, NY 11101
Borough
Queens
BIN
4439046
BBL
4000500001
Source summonses
4
Hearing dates in source
December 29, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 10-31 through 10-35 45 ROAD; 10-38 45 AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 10-38 45 Avenue, Queens, NY 11101?

The uploaded record lists 4 summonses, including 039560975Z (facade / exterior wall safety), 039560978Y (fire escape / exit obstruction), 039560976K (site safety / construction operations), 039560977M (work contrary to approved plans). The source-listed hearing date: December 29, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39560975Z
039560975Z
8:30 AM
CLASS - 1Facade / exterior wall safetyPENDING
39560978Y
039560978Y
8:30 AM
CLASS - 1Fire escape / exit obstructionPENDING
39560976K
039560976K
9:30 AM
CLASS - 2Site safety / construction operationsPENDING
39560977M
039560977M
10:30 AM
CLASS - 1Work contrary to approved plansPENDING

How the 4 recorded summonses relate at 10-38 45 Avenue, Queens, NY 11101

The verified property matching links 4 distinct summonses to 10-38 45 Avenue, Queens, NY 11101. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Facade / exterior wall safety (1): source summons 039560975Z. Check this charge separately, even when its documents can be gathered with other property records.

Fire escape / exit obstruction (1): source summons 039560978Y. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039560976K. Check this charge separately, even when its documents can be gathered with other property records.

Work contrary to approved plans (1): source summons 039560977M. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 4 summonses list October 23, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39560975Z

Normalized ten-character lookup: 039560975Z (infraction 1P7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

3306.8.2 (3). OBSERVED FREESTANDING WALL @ EXP 4 NEEDING TO BE BRACED. NO SECTION OF MASONRY WALL WITH A HEIGHT TO THICKNESS RATIO GREATER THAN 22 SHALL BE PERMITTED TO STAND WITHOUT THE WALL BEING BRACED. SUCH

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
October 23, 2026
Service date
October 23, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 10-38 45 Avenue, Queens, NY 11101

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “3306.8.2 (3). OBSERVED FREESTANDING WALL @ EXP 4 NEEDING TO BE BRACED. NO SECTION OF MASONRY WALL WITH A HEIGHT TO THICKNESS RATIO GREATER THAN 22 SHALL BE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560975Z.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560975Z, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 10-38 45 Avenue, Queens, NY 11101
Summons 2 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 39560978Y

Normalized ten-character lookup: 039560978Y (infraction 181)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED DEBRIS THROUGHOUT ENTIRE SITE CREATING A LACK OF EGRESS TO EXIT IN THE CASE OF EMERGENCY, DEBRIS MUST BE CLEARED BEFORE PROGRESSING TO ANOTHER SECTION OF THE DEMO. SITE CONDITIONS CREATE HAZARDOUS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 181 — BC 3303.4 & 27-1018 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS
Issue date
October 23, 2026
Service date
October 23, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 10-38 45 Avenue, Queens, NY 11101

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED DEBRIS THROUGHOUT ENTIRE SITE CREATING A LACK OF EGRESS TO EXIT IN THE CASE OF EMERGENCY, DEBRIS MUST BE CLEARED BEFORE PROGRESSING TO ANOTHE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560978Y.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560978Y, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 10-38 45 Avenue, Queens, NY 11101
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560976K

Normalized ten-character lookup: 039560976K (infraction 209)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED WATER HOSE FOR DUST MITIGATION SPRAYING WATER OVER THE CF AND INTO THE PEDESTRIAN PASSAGEWAY CREATING UNSAFE SLIP AND FALL HAZARDS TO PEDESTRIANS ACCESSING THE WALKWAY.REMOVE OR REPLACE WATER HOSE AS T

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 209 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Issue date
October 23, 2026
Service date
October 23, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 10-38 45 Avenue, Queens, NY 11101

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED WATER HOSE FOR DUST MITIGATION SPRAYING WATER OVER THE CF AND INTO THE PEDESTRIAN PASSAGEWAY CREATING UNSAFE SLIP AND FALL HAZARDS TO PEDESTRIANS…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560976K.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560976K, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 10-38 45 Avenue, Queens, NY 11101
Summons 4 of the source-linked property

Work contrary to approved plans — ECB/OATH summons 39560977M

Normalized ten-character lookup: 039560977M (infraction 182)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record alleges work that differs from DOB-approved documents or amendments. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED DEMO OUT OF SEQUENCE ACCORDING TO APPROVED PLANS (DM203) WALL SHOULD BE DEMOED AT A 45 DEGREE ANGLE UNTIL THE WALL IS REMOVE WITH DEBRIS BEING CLEARED IN ORDER TO MOVE TO THE NEXT PHASE. SITE CONDITION

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 182 — 28-105.12.2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV
Issue date
October 23, 2026
Service date
October 23, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 10-38 45 Avenue, Queens, NY 11101

Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED DEMO OUT OF SEQUENCE ACCORDING TO APPROVED PLANS (DM203) WALL SHOULD BE DEMOED AT A 45 DEGREE ANGLE UNTIL THE WALL IS REMOVE WITH DEBRIS BEING CLE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560977M.

  • Whether the cited plans were the operative approved set on the inspection date
  • Whether an approved amendment, phased work or as-built record covers the observed condition
  • Whether the alleged difference is accurately described and located
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Compare field conditions with approved documents through a registered design professional.
  • Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved plans, amendments and application history
  • current as-built measurements or professional field report
  • dated construction photographs and contractor records
  • inspection and sign-off documents

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560977M, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.

Request help with work contrary to approved plans at 10-38 45 Avenue, Queens, NY 11101
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 10-38 45 Avenue, Queens, NY 11101 — not just the summons number

For this property, start with facade / exterior wall safety and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.
  • Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.
  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 29, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.