1005 1 Avenue, Manhattan, NY 10022 — Work contrary to approved plans and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1005 1 Avenue, Manhattan, NY 10022 and source-listed dates December 3, 2026, December 31, 2026. Recorded concerns include work contrary to approved plans, facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work contrary to approved plansFacade / exterior wall safety
Verified premises, hearing and enforcement snapshot
Verified premises address
1005 1 Avenue, Manhattan, NY 10022
Borough
Manhattan
BIN
1039972
BBL
1013480023
Source summonses
2
Hearing dates in source
December 3, 2026, December 31, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 1005 through 1021 1 AVENUE; 338 through 354 EAST 56 STREET; 349 through 355 EAST 55 STREET
Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 1005 1 Avenue, Manhattan, NY 10022?
The uploaded record lists 2 summonses, including 039559286P (work contrary to approved plans), 039561011Z (facade / exterior wall safety). The source-listed hearing dates: December 3, 2026, December 31, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 1005 1 Avenue, Manhattan, NY 10022
The verified property matching links 2 distinct summonses to 1005 1 Avenue, Manhattan, NY 10022. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Facade / exterior wall safety (1): source summons 039561011Z. Check this charge separately, even when its documents can be gathered with other property records.
Work contrary to approved plans (1): source summons 039559286P. Check this charge separately, even when its documents can be gathered with other property records.
More than one source-listed hearing date: December 3, 2026, December 31, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work contrary to approved plans — ECB/OATH summons 39559286P
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: structural framing.
Inspector narrative as preserved in source data — potentially incomplete
DURING THE INSPECTION OF ALTERATION WORKS FOR THE 27-STORY BUILDING, OBSERVED AT 22ND FLOOR, 2 STEEL COLUMN CONNECTIONS CONTAIN MULTIPLE UNUSED BOLT HOLES. UPON REVIEW OF THE APPROVED SHOP DRAWINGS, THESE UNUSE
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
September 17, 2026
Service date
September 17, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1005 1 Avenue, Manhattan, NY 10022
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “DURING THE INSPECTION OF ALTERATION WORKS FOR THE 27-STORY BUILDING, OBSERVED AT 22ND FLOOR, 2 STEEL COLUMN CONNECTIONS CONTAIN MULTIPLE UNUSED BOLT HOLES.…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039559286P.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved framing plans and structural engineer assessment
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039559286P, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: sidewalk shed, electrical installation, structural framing, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
BC 3301.9.7: AT TIME OF INSPECTION, OBSERVED THE SIDEWALK SHED PARAPET PANEL AT EXPOSURE 1 & 2 COVERED WITH UNLAWFUL ADVERTISING POSTERS UNRELATED TO THE JOBSITE. POSTERS SEEN AFFIXED TO THE PROTECTIVE STRUCTUR
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2F4 — BC3307.1.1/BC3307.4.6 POSTING OF UNLAWFUL SIGNS/INFO/PICTURES/ADS ON PROTECTIVE STRUCTURES
Issue date
October 24, 2026
Service date
October 24, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 1005 1 Avenue, Manhattan, NY 10022
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: sidewalk shed, electrical installation, structural framing, exterior masonry. Record-specific inspection detail: Inspector text begins: “BC 3301.9.7: AT TIME OF INSPECTION, OBSERVED THE SIDEWALK SHED PARAPET PANEL AT EXPOSURE 1 & 2 COVERED WITH UNLAWFUL ADVERTISING POSTERS UNRELATED TO THE J…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039561011Z.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
shed permit and contractor maintenance report
licensed electrician report and electrical filing history
approved framing plans and structural engineer assessment
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039561011Z, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 1005 1 Avenue, Manhattan, NY 10022 — not just the summons number
For this property, start with work contrary to approved plans and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 3, 2026, December 31, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.