Facade / exterior wall safety — ECB/OATH summons 39557435K
Normalized ten-character lookup: 039557435K (infraction 2P7)
Source allegation and actual cited law
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: roof or rooftop, sidewalk shed, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
@PERMITTED INACTIVE 3STORY FACADE REPAIR SITE OBSERVE SUPPORTED SCAFFOLD ON TOP OF SIDEWALK SHED UP TO ROOF LEVEL@EXP#1-2 WITH UNSECURED DEBRIS/MATERIAL (PLYWOOD/BRICKS) ON PLATFORM THAT'S NOT TIED DOWN&MISSING
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2P7
- Issue date
- August 3, 2026
- Service date
- August 3, 2026
- Source severity
- CLASS - 2
- Source violation type
- Unknown
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 104-02 115 Street, Queens, NY 11419
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: roof or rooftop, sidewalk shed, exterior masonry. Record-specific inspection detail: Inspector text begins: “@PERMITTED INACTIVE 3STORY FACADE REPAIR SITE OBSERVE SUPPORTED SCAFFOLD ON TOP OF SIDEWALK SHED UP TO ROOF LEVEL@EXP#1-2 WITH UNSECURED DEBRIS/MATERIAL (P…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039557435K.
- Whether the specific facade element or inspection/report obligation was correctly identified
- Whether applicable inspection or FISP filings were submitted and accepted on time
- Whether a protective shed, hazard notice or unsafe-condition order applies separately
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
- Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- dated roof photographs and any roofing/equipment permit documents
- shed permit and contractor maintenance report
- photographs by elevation and facade professional repair reports
- facade/critical-examination reports, amendments and acceptance receipts
- photographs with elevation/exposure labels and dated repair records
- QEW or design professional evaluations and DOB correspondence
- sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039557435K, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
Request help with facade / exterior wall safety at 104-02 115 Street, Queens, NY 11419