1225 Sheridan Avenue, Bronx, NY 10456 — Sidewalk shed / scaffolding and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 1225 Sheridan Avenue, Bronx, NY 10456 and source-listed date December 4, 2026. Recorded concerns include sidewalk shed / scaffolding, facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Sidewalk shed / scaffoldingFacade / exterior wall safety

Verified premises, hearing and enforcement snapshot

Verified premises address
1225 Sheridan Avenue, Bronx, NY 10456
Borough
Bronx
BIN
2002772
BBL
2024570026
Source summonses
3
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1225 SHERIDAN AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 1225 Sheridan Avenue, Bronx, NY 10456?

The uploaded record lists 3 summonses, including 039559422K (sidewalk shed / scaffolding), 039559423M (facade / exterior wall safety), 039559421Z (sidewalk shed / scaffolding). The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559422K
039559422K
8:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING
39559423M
039559423M
9:30 AM
CLASS - 2Facade / exterior wall safetyPENDING
39559421Z
039559421Z
10:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING

How the 3 recorded summonses relate at 1225 Sheridan Avenue, Bronx, NY 10456

The verified property matching links 3 distinct summonses to 1225 Sheridan Avenue, Bronx, NY 10456. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Sidewalk shed / scaffolding (2): source summons 039559422K, 039559421Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Facade / exterior wall safety (1): source summons 039559423M. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 3 summonses list September 21, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Exterior-wall remediation and sidewalk-shed maintenance or permits are separate tracks even if the shed protects pedestrians from the same facade hazard.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559422K

Normalized ten-character lookup: 039559422K (infraction 2L7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: front exposure, sidewalk shed.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED 5 STORY OCCUPIED RESIDENTIAL BUILDING WITH SIDEWALK SHED ERECTED AT EXP1. AT TIME OF INSPECTION UPON RESEARCH OF DEPT FILINGS PERMIT FOR SIDEWALK SHED WAS NOT ISSUED OR ON FILE. NO PERMIT PROMPTS LACK

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2L7
Issue date
September 21, 2026
Service date
September 21, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1225 Sheridan Avenue, Bronx, NY 10456

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: front exposure, sidewalk shed. Record-specific inspection detail: Inspector text begins: “OBSERVED 5 STORY OCCUPIED RESIDENTIAL BUILDING WITH SIDEWALK SHED ERECTED AT EXP1. AT TIME OF INSPECTION UPON RESEARCH OF DEPT FILINGS PERMIT FOR SIDEWALK…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559422K.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • shed permit and contractor maintenance report
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559422K, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 1225 Sheridan Avenue, Bronx, NY 10456
Summons 2 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39559423M

Normalized ten-character lookup: 039559423M (infraction 217)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: front exposure, sidewalk shed, electrical installation, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED 5 STORY OCCUPIED RESIDENTIAL BUILDING WITH SIDEWALK SHED ERECTED AT EXP1. AT TIME OF INSPECTION I OBSERVED NO INFORMATION PANEL POSTED ON PARAPET WALL. THESE CONDITIONS ARE UNSAFE FOR PUBLIC AND REDUCE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
Issue date
September 21, 2026
Service date
September 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1225 Sheridan Avenue, Bronx, NY 10456

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: front exposure, sidewalk shed, electrical installation, exterior masonry. Record-specific inspection detail: Inspector text begins: “OBSERVED 5 STORY OCCUPIED RESIDENTIAL BUILDING WITH SIDEWALK SHED ERECTED AT EXP1. AT TIME OF INSPECTION I OBSERVED NO INFORMATION PANEL POSTED ON PARAPET…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559423M.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • shed permit and contractor maintenance report
  • licensed electrician report and electrical filing history
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559423M, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 1225 Sheridan Avenue, Bronx, NY 10456
Summons 3 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559421Z

Normalized ten-character lookup: 039559421Z (infraction 223)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: front exposure, sidewalk shed.

Inspector narrative as preserved in source data — potentially incomplete

OBSERVED 5 STORY OCCUPIED RESIDENTIAL BUILDING WITH SIDEWALK SHED ERECTED AT EXP1. AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED NOT MAINTAINED AS PER CODE. SEVERAL DAMAGED MUDSILLS, EXPOSED BOLTS AND METAL S

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
Issue date
September 21, 2026
Service date
September 21, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,400.00
Balance field in extract
$2,400.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1225 Sheridan Avenue, Bronx, NY 10456

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: front exposure, sidewalk shed. Record-specific inspection detail: Inspector text begins: “OBSERVED 5 STORY OCCUPIED RESIDENTIAL BUILDING WITH SIDEWALK SHED ERECTED AT EXP1. AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED NOT MAINTAINED AS PER COD…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559421Z.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • shed permit and contractor maintenance report
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559421Z, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 1225 Sheridan Avenue, Bronx, NY 10456
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1225 Sheridan Avenue, Bronx, NY 10456 — not just the summons number

For this property, start with sidewalk shed / scaffolding and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Sidewalk shed / scaffolding (2 source summonses): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.