132-35 Avery Avenue, Queens, NY 11355 — Unpermitted electrical work and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 132-35 Avery Avenue, Queens, NY 11355 and source-listed date December 7, 2026. Recorded concerns include unpermitted electrical work, facade / exterior wall safety, work without a permit. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Unpermitted electrical workFacade / exterior wall safetyWork without a permit
Verified premises, hearing and enforcement snapshot
Verified premises address
132-35 Avery Avenue, Queens, NY 11355
Borough
Queens
BIN
4115154
BBL
4051040051
Source summonses
3
Hearing dates in source
December 7, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 132-35 AVERY AVENUE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 132-35 Avery Avenue, Queens, NY 11355?
The uploaded record lists 3 summonses, including 039181361Y (unpermitted electrical work), 039181366N (facade / exterior wall safety), 039181369Z (work without a permit). The source-listed hearing date: December 7, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 132-35 Avery Avenue, Queens, NY 11355
The verified property matching links 3 distinct summonses to 132-35 Avery Avenue, Queens, NY 11355. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Facade / exterior wall safety (1): source summons 039181366N. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039181361Y. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039181369Z. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list March 22, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Unpermitted electrical work — ECB/OATH summons 39181361Y
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: rear exposure or yard, electrical installation, apartment or dwelling unit, air-conditioning or mechanical equipment.
Inspector narrative as preserved in source data — potentially incomplete
NO GENERAL WIRING PERMITS ON FILE FOR THE ELECTRICAL WORK DONE IN REAR INSTALLED NEW A/C SPLIT UNIT WITH SERVICE DISCONNECT, NEW LIGHT INSTALLED, AND NEW WIRES HAVE BEEN RUN, CUTTING HOLES IN WALLS. UPON REVIEW
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
March 22, 2026
Service date
March 22, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 132-35 Avery Avenue, Queens, NY 11355
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: rear exposure or yard, electrical installation, apartment or dwelling unit, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “NO GENERAL WIRING PERMITS ON FILE FOR THE ELECTRICAL WORK DONE IN REAR INSTALLED NEW A/C SPLIT UNIT WITH SERVICE DISCONNECT, NEW LIGHT INSTALLED, AND NEW W…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039181361Y.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
rear-exposure photos tied to the inspection date
licensed electrician report and electrical filing history
approved unit layout and relevant lawful occupancy records
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039181361Y, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: roof or rooftop, rear exposure or yard, front exposure, gas or boiler equipment.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. CRACK IN FACADE AT FRONT OF BUILDING, BOILER ROOM CEILING MISSING, AND HAS STORAGE IN THE BOILER ROOM, TRASH PILE IN REAR YARD OF OLD ROOF WHEN REMOVED 4FT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
March 22, 2026
Service date
March 22, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 132-35 Avery Avenue, Queens, NY 11355
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: roof or rooftop, rear exposure or yard, front exposure, gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. CRACK IN FACADE AT FRONT OF BUILDING, BOILER ROOM CEILING MISSING, AND HAS STORAGE IN THE BOILER ROO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039181366N.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
rear-exposure photos tied to the inspection date
front-exposure photos showing the area alleged
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039181366N, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: rear exposure or yard, front exposure.
Inspector narrative as preserved in source data — potentially incomplete
NO PERMITS ON FILE NEW WALLS PUT UP TO MAKE EXTRA ROOMS ON 1ST AND 2ND FLOOR OF BUILDING, 1ST FLOOR FRONT ROOM TURNED INTO GAMBLING LOCATION WITH SLOT MACHINES, WHICH WAS FOUND BY FDNY, ALSO IN REAR YARD BUILDI
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 22, 2026
Service date
March 22, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 132-35 Avery Avenue, Queens, NY 11355
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: rear exposure or yard, front exposure. Record-specific inspection detail: Inspector text begins: “NO PERMITS ON FILE NEW WALLS PUT UP TO MAKE EXTRA ROOMS ON 1ST AND 2ND FLOOR OF BUILDING, 1ST FLOOR FRONT ROOM TURNED INTO GAMBLING LOCATION WITH SLOT MACH…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039181369Z.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
rear-exposure photos tied to the inspection date
front-exposure photos showing the area alleged
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039181369Z, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 132-35 Avery Avenue, Queens, NY 11355 — not just the summons number
For this property, start with unpermitted electrical work and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 7, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.