NYC DOB / ECB / OATH hearings · verified property resolution

160-25 Archer Avenue, Queens, NY 11433 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 160-25 Archer Avenue, Queens, NY 11433 and source-listed date December 15, 2026. Recorded concerns include facade / exterior wall safety, electrical safety / service equipment, boiler / gas / plumbing compliance. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safetyElectrical safety / service equipmentBoiler / gas / plumbing compliance

Verified premises, hearing and enforcement snapshot

Verified premises address
160-25 Archer Avenue, Queens, NY 11433
Borough
Queens
BIN
4215619
BBL
4101010027
Source summonses
3
Hearing dates in source
December 15, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 160-25 through 160-31 ARCHER AVENUE; 92-32 through 92-38 UNION HALL STREET

Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 160-25 Archer Avenue, Queens, NY 11433?

The uploaded record lists 3 summonses, including 039199878M (facade / exterior wall safety), 039199901L (electrical safety / service equipment), 039199902N (boiler / gas / plumbing compliance). The source-listed hearing date: December 15, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39199878M
039199878M
8:30 AM
CLASS - 1Facade / exterior wall safetyIN VIOLATION
39199901L
039199901L
8:30 AM
CLASS - 1Electrical safety / service equipmentIN VIOLATION
39199902N
039199902N
8:30 AM
CLASS - 1Boiler / gas / plumbing compliancePENDING

How the 3 recorded summonses relate at 160-25 Archer Avenue, Queens, NY 11433

The verified property matching links 3 distinct summonses to 160-25 Archer Avenue, Queens, NY 11433. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Boiler / gas / plumbing compliance (1): source summons 039199902N. Check this charge separately, even when its documents can be gathered with other property records.

Electrical safety / service equipment (1): source summons 039199901L. Check this charge separately, even when its documents can be gathered with other property records.

Facade / exterior wall safety (1): source summons 039199878M. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 3 summonses list August 10, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Mixed procedural statuses: IN VIOLATION: 2; PENDING: 1. Confirm the present status and decision for each ticket before preparing one combined response.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39199878M

Normalized ten-character lookup: 039199878M (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN BUILDING IN CODE -COMPLIANT MANNER. ATOI I OBSERVED AT EXPOSURE#4 THE WALL FACADE IS IN DISREPAIR FROM THE GROUND LEVEL UP TO THIS 4TH FLOOR LEVEL, LOOSE BRICK WITH MISSING MORTAR AN THE CHI

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
August 10, 2026
Service date
August 10, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
IN VIOLATION
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 160-25 Archer Avenue, Queens, NY 11433

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN CODE -COMPLIANT MANNER. ATOI I OBSERVED AT EXPOSURE#4 THE WALL FACADE IS IN DISREPAIR FROM THE GROUND LEVEL UP TO THIS 4TH…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039199878M.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Outcome-style status in source: what to verify before acting

The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.

Need a summons-specific action plan? For 039199878M, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 160-25 Archer Avenue, Queens, NY 11433
Summons 2 of the source-linked property

Electrical safety / service equipment — ECB/OATH summons 39199901L

Normalized ten-character lookup: 039199901L (infraction 1D2)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: electrical installation.

Inspector narrative as preserved in source data — potentially incomplete

UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED IN STAIRWAY B THE SMOKE PURGE IS HANGING FROM CEILING THE LOUVERS ARE BROKEN NEEDS TO BE I

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Issue date
August 10, 2026
Service date
August 10, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
IN VIOLATION
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$1,600.00
Balance field in extract
$1,600.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 160-25 Archer Avenue, Queens, NY 11433

Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. OBSERVED IN STAIRWAY B THE SMOKE PURGE IS HA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039199901L.

  • Whether the cited component, clearance or unsafe condition existed as described
  • Whether the equipment met the applicable requirements and was inspected/maintained
  • Whether the notice identified the correct location and owner responsibility
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
  • Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • electrical service and panel photographs with location
  • licensed electrician safety evaluation and invoices
  • electrical permits, inspections and test reports
  • equipment specification or maintenance and repair records

Outcome-style status in source: what to verify before acting

The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.

Need a summons-specific action plan? For 039199901L, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.

Request help with electrical safety / service equipment at 160-25 Archer Avenue, Queens, NY 11433
Summons 3 of the source-linked property

Boiler / gas / plumbing compliance — ECB/OATH summons 39199902N

Normalized ten-character lookup: 039199902N (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The citation relates to gas, plumbing, boiler or mechanical equipment, permits or inspections. Key locations/components named in the source: gas or boiler equipment.

Inspector narrative as preserved in source data — potentially incomplete

ATOI OBSERVED IN THE ROOM MECHANICAL ROOM A WATER HEATER WAS INSTALLED BEHIND ANOTHER AND BOXED IN WITH NO ROOM OR ACCESS FOR REPAIR/REPLACEMENT/SERVICE. ALSO PVC ON BOILER EXHAUST. CONTRARY TO MC 306 - ACCESS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
August 10, 2026
Service date
August 10, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 160-25 Archer Avenue, Queens, NY 11433

Identify the cited installation, system or report cycle and compare it with the building’s approved equipment and trade filings. Key locations/components named in the source: gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED IN THE ROOM MECHANICAL ROOM A WATER HEATER WAS INSTALLED BEHIND ANOTHER AND BOXED IN WITH NO ROOM OR ACCESS FOR REPAIR/REPLACEMENT/SERVICE. A…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039199902N.

  • Whether a required permit, inspection or periodic filing actually applied at that time
  • Whether licensed-trade repairs, test results or sign-offs already address the cited item
  • Whether the exact equipment and property location match the notice
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have potentially dangerous gas or boiler conditions checked by a properly licensed professional promptly.
  • Arrange the correct mechanical/plumbing/gas filing, inspection, repairs or report submission and closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed-trade test results and equipment/permit records
  • plumbing/gas/boiler permit and inspection history
  • licensed contractor reports, tests and paid invoices
  • equipment photographs, serials or specifications
  • DOB/utility correspondence and accepted sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039199902N, Building Violation LLC can scope mechanical/plumbing violation research and licensed-trade correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with boiler / gas / plumbing compliance at 160-25 Archer Avenue, Queens, NY 11433
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 160-25 Archer Avenue, Queens, NY 11433 — not just the summons number

For this property, start with facade / exterior wall safety and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.
  • Electrical safety / service equipment (1 source summons): Electrical maintenance summons analysis and licensed-trade remediation.
  • Boiler / gas / plumbing compliance (1 source summons): Mechanical/plumbing violation research and licensed-trade correction coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 15, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.