168 Bradford Street, Brooklyn, NY 11207 — Facade / exterior wall safety and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 8 DOB/ECB/OATH summonses with 168 Bradford Street, Brooklyn, NY 11207 and source-listed dates December 11, 2026, December 15, 2026, December 17, 2026. Recorded concerns include facade / exterior wall safety, vacate or padlock order, unsafe condition / maintenance and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Facade / exterior wall safetyVacate or padlock orderUnsafe condition / maintenanceCertificate of Correction / order noncompliance
Verified premises, hearing and enforcement snapshot
Verified premises address
168 Bradford Street, Brooklyn, NY 11207
Borough
Brooklyn
BIN
3083569
BBL
3036900022
Source summonses
8
Hearing dates in source
December 11, 2026, December 15, 2026, December 17, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN
Official PAD aliases and building ranges: 168 BRADFORD STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: 4 default-status record(s) in the source; one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 168 Bradford Street, Brooklyn, NY 11207?
The uploaded record lists 8 summonses, including 035461462Y (vacate or padlock order), 035490822L (facade / exterior wall safety), 035387272K (certificate of correction / order noncompliance), 035452581M (vacate or padlock order) and additional tickets. The source-listed hearing dates: December 11, 2026, December 15, 2026, December 17, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 8 recorded summonses relate at 168 Bradford Street, Brooklyn, NY 11207
The verified property matching links 8 distinct summonses to 168 Bradford Street, Brooklyn, NY 11207. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Facade / exterior wall safety (3): source summons 035490822L, 035577208N, 035556028N. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Unsafe condition / maintenance (2): source summons 035582280Y, 035632004K. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Vacate or padlock order (2): source summons 035461462Y, 035452581M. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Certificate of Correction / order noncompliance (1): source summons 035387272K. Check this charge separately, even when its documents can be gathered with other property records.
Potential shared workstream: Check whether the maintenance condition is the subject of the earlier compliance order; correcting the physical defect may still require a separate DOB certification.
More than one source-listed hearing date: December 11, 2026, December 15, 2026, December 17, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Mixed procedural statuses: DEFAULT: 4; PENDING: 4. Confirm the present status and decision for each ticket before preparing one combined response.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Vacate or padlock order — ECB/OATH summons 35461462Y
DOB describes a possible violation of a vacate/closure order or related premises-access restriction. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
REISSUE #35452581M DAT EOF ISSUE:10-24-2019 REMOVE OR DEFACED A WRITTEN POSTED VACATE ORDER NOTED THE POSTED VACATE ORDER WAS REPOSTED TODAY 12-31-2019 COMPLY WITH CODE
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
1G1 — 28-207.4.4 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER
Issue date
December 31, 2019
Service date
December 31, 2019
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
Obtain the original vacate, closure or padlock order and identify the affected rooms, floors or premises. The issue is whether the condition and access described in this summons match the operative order and its effective dates. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “REISSUE #35452581M DAT EOF ISSUE:10-24-2019 REMOVE OR DEFACED A WRITTEN POSTED VACATE ORDER NOTED THE POSTED VACATE ORDER WAS REPOSTED TODAY 12-31-2019 COM…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035461462Y.
Whether the order was active and applied to the exact cited premises at the inspection date
Whether the reported occupancy, access or use occurred as described
Whether an agency lift, modification, written permission or other record predates the inspection
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Do not rely on a hearing alone to lift a vacate or padlock order. Confirm the active agency restriction and required remedy.
Document that the prohibited occupancy or access has ceased, and arrange any required permits, inspections, corrections and formal agency lift.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
original vacate/padlock order and service history
agency correspondence, modification or lifting documents
dated photographs and occupant/access records for the cited areas
approved plans, permits and inspections supporting the corrective work
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035461462Y, Building Violation LLC can scope vacate-order research, hearing response and a coordinated order-lift/correction plan after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: door or exit route, windows.
Inspector narrative as preserved in source data — potentially incomplete
REISSUE#35416399 DATE OF ISSUE: 1-29-20. FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCE AT 1ST FL LEVEL. ENTRANCE DOOR IS BROKEN. FEW WINDOWIS CLOSED BY PLASTER 2ND FL & 1ST FL. FEW WINDOW AT 2ND FL BROKEN & GL
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
Issue date
September 8, 2020
Service date
September 8, 2020
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: door or exit route, windows. Record-specific inspection detail: Inspector text begins: “REISSUE#35416399 DATE OF ISSUE: 1-29-20. FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCE AT 1ST FL LEVEL. ENTRANCE DOOR IS BROKEN. FEW WINDOWIS CLOSED BY PL…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035490822L.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
door/exit photographs and approved egress plans
window photographs and approved facade or window work plans
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035490822L, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35323251L ISSUED ON 03/26/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.NOTE:NO DOCUMENT FILE FO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
Issue date
August 2, 2018
Service date
August 17, 2018
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35323251L ISSUED ON 03/26/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUAN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035387272K.
Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
Whether the prior order references the correct premises and responsible party
Whether the earlier cited condition has been corrected and what current DOB closeout record shows
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Retrieve the original violation, deadline and agency compliance requirements.
Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
underlying summons, order and deadline notice
DOB Certificate of Correction filings and acknowledgments
before/after dated photographs and signed affidavits where required
contractor or licensed-professional invoices and sign-offs
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035387272K, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.
DOB describes a possible violation of a vacate/closure order or related premises-access restriction. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data
REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:THE POSTED VACATE ORDER WAS REMOVED.VACATE ORDER WAS RE-POSTED ON 10/24/19.REM:COMPLYWITH CODE
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
1G1 — 28-207.4.4 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER
Issue date
October 24, 2019
Service date
October 24, 2019
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
Obtain the original vacate, closure or padlock order and identify the affected rooms, floors or premises. The issue is whether the condition and access described in this summons match the operative order and its effective dates. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:THE POSTED VACATE ORDER WAS REMOVED.VACATE ORDER WAS RE-POSTED ON 10/24/19.REM:COMPLYWITH CODE”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035452581M.
Whether the order was active and applied to the exact cited premises at the inspection date
Whether the reported occupancy, access or use occurred as described
Whether an agency lift, modification, written permission or other record predates the inspection
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Do not rely on a hearing alone to lift a vacate or padlock order. Confirm the active agency restriction and required remedy.
Document that the prohibited occupancy or access has ceased, and arrange any required permits, inspections, corrections and formal agency lift.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
original vacate/padlock order and service history
agency correspondence, modification or lifting documents
dated photographs and occupant/access records for the cited areas
approved plans, permits and inspections supporting the corrective work
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 035452581M, Building Violation LLC can scope vacate-order research, hearing response and a coordinated order-lift/correction plan after reviewing the actual notice and current DOB/OATH record.
DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: front exposure, windows.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION,OBSERVED AT EXP#1(FRONT),2(LEFT)& 4(RIGHT);ALL HAVE MISSING,DAMAGED & SIDING THAT ARE HANGING. AT EXP#1;HAVE A BROKEN WINDOW AT TH
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
August 17, 2021
Service date
August 17, 2021
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$12,500.00
Balance field in extract
$12,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: front exposure, windows. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION,OBSERVED AT EXP#1(FRONT),2(LEFT)& 4(RIGHT);ALL HAVE MISSING,DAMAGED & SIDIN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035582280Y.
Whether the exact physical condition and location existed on the inspection date
Whether the cited component and applicable maintenance standard were correctly identified
Whether repairs, inspections or other contemporaneous records change the factual assessment
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
window photographs and approved facade or window work plans
time-stamped photographs of the specific alleged condition
maintenance and repair tickets, invoices and professional findings
prior complaints, reports and permit history where relevant
dated post-correction photographs and agency compliance records
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 035582280Y, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: front exposure, windows.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.NOTE DURING INSPECTION OBSERVED AT EXP1-2 FLOOR WINDOW IS MISSING 1ST FLOOR WINDOWS ARE BROKEN SIDING AT VARIOUS LOCATIONS ARE BROKEN,HANGING AND/OR MISSING.
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
Issue date
June 7, 2021
Service date
June 7, 2021
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: front exposure, windows. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES.NOTE DURING INSPECTION OBSERVED AT EXP1-2 FLOOR WINDOW IS MISSING 1ST FLOOR WINDOWS ARE BROKEN SIDING A…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035577208N.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
window photographs and approved facade or window work plans
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 035577208N, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: structural framing.
Inspector narrative as preserved in source data
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: EXP#1,2&4 HAVE MISSING & DAMAGE SIDING. SIDING BREAKING APART FROM STRUCTURE. OPENWINDOWS ALLOWING ELEMENTS & VERMON. REMEDY: COMPLY WITH CODE.
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 19, 2021
Service date
October 19, 2021
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$3,125.00
Balance field in extract
$3,125.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: EXP#1,2&4 HAVE MISSING & DAMAGE SIDING. SIDING BREAKING APART FROM STRUCTURE. OPENWINDOWS ALLOWIN…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035632004K.
Whether the exact physical condition and location existed on the inspection date
Whether the cited component and applicable maintenance standard were correctly identified
Whether repairs, inspections or other contemporaneous records change the factual assessment
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
approved framing plans and structural engineer assessment
time-stamped photographs of the specific alleged condition
maintenance and repair tickets, invoices and professional findings
prior complaints, reports and permit history where relevant
dated post-correction photographs and agency compliance records
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 035632004K, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.1FL@EXP2 WINDOWS HASBEEN PULLED OUT&IS OPEN TO ELEMENTS,MISSING SIDING@EXP2,TEAR OUT SIDING@EXP4 TO ADJACENT PREMISES.166BRADFORDST POSSIBLE INJURY OF WALKING I
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
Issue date
April 17, 2021
Service date
April 17, 2021
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 168 Bradford Street, Brooklyn, NY 11207
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.1FL@EXP2 WINDOWS HASBEEN PULLED OUT&IS OPEN TO ELEMENTS,MISSING SIDING@EXP2,TEAR OUT SIDING@EXP4 TO ADJAC…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 035556028N.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 035556028N, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 168 Bradford Street, Brooklyn, NY 11207 — not just the summons number
For this property, start with facade / exterior wall safety and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 11, 2026, December 15, 2026, December 17, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.