NYC DOB / ECB / OATH hearings · verified property resolution

17 Essex Street, Manhattan, NY 10002 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 17 Essex Street, Manhattan, NY 10002 and source-listed dates December 10, 2026, December 17, 2026. Recorded concerns include facade / exterior wall safety, vacate or padlock order. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safetyVacate or padlock order

Verified premises, hearing and enforcement snapshot

Verified premises address
17 Essex Street, Manhattan, NY 10002
Borough
Manhattan
BIN
1003815
BBL
1002970021
Source summonses
2
Hearing dates in source
December 10, 2026, December 17, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 17 ESSEX STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 17 Essex Street, Manhattan, NY 10002?

The uploaded record lists 2 summonses, including 039206410J (facade / exterior wall safety), 039207299P (vacate or padlock order). The source-listed hearing dates: December 10, 2026, December 17, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39206410J
039206410J
8:30 AM
CLASS - 1Facade / exterior wall safetyPENDING
39207299P
039207299P
9:30 AM
CLASS - 1Vacate or padlock orderPENDING

How the 2 recorded summonses relate at 17 Essex Street, Manhattan, NY 10002

The verified property matching links 2 distinct summonses to 17 Essex Street, Manhattan, NY 10002. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Facade / exterior wall safety (1): source summons 039206410J. Check this charge separately, even when its documents can be gathered with other property records.

Vacate or padlock order (1): source summons 039207299P. Check this charge separately, even when its documents can be gathered with other property records.

More than one source-listed hearing date: December 10, 2026, December 17, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39206410J

Normalized ten-character lookup: 039206410J (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: door or exit route, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

NOTED AT TIME OF INSPECTION, SECTIONS OF CORNICE STONE BELOW THE PARAPET WERE OBSERVED TO HAVE BECOME DISLODGED AND FALLEN ONTO THE PUBLIC STREET BELOW COMPROMISING 8 APARTMENTS EGRESS EFFECTED, REPAIR AND/REPL

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 1, 2026
Service date
October 1, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 17 Essex Street, Manhattan, NY 10002

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: door or exit route, exterior masonry. Record-specific inspection detail: Inspector text begins: “NOTED AT TIME OF INSPECTION, SECTIONS OF CORNICE STONE BELOW THE PARAPET WERE OBSERVED TO HAVE BECOME DISLODGED AND FALLEN ONTO THE PUBLIC STREET BELOW COM…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206410J.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206410J, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 17 Essex Street, Manhattan, NY 10002
Summons 2 of the source-linked property

Vacate or padlock order — ECB/OATH summons 39207299P

Normalized ten-character lookup: 039207299P (infraction 1G1)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB describes a possible violation of a vacate/closure order or related premises-access restriction. Key locations/components named in the source: front exposure, door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER, AT THE TIME OF INSPECTION A WRITTEN POSTED VACATE# M134/2026 ISSUED ON 10/01/2026 HAS BEEN REMOVED FROM THE FRONT ENTRY DOOR, VACATE ORDER STILL ACTIVE., COMPLY

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1G1 — 28-207.4.4 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 17 Essex Street, Manhattan, NY 10002

Obtain the original vacate, closure or padlock order and identify the affected rooms, floors or premises. The issue is whether the condition and access described in this summons match the operative order and its effective dates. Key locations/components named in the source: front exposure, door or exit route. Record-specific inspection detail: Inspector text begins: “REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER, AT THE TIME OF INSPECTION A WRITTEN POSTED VACATE# M134/2026 ISSUED ON 10/01/2026 HAS BEEN REMOVED FROM T…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039207299P.

  • Whether the order was active and applied to the exact cited premises at the inspection date
  • Whether the reported occupancy, access or use occurred as described
  • Whether an agency lift, modification, written permission or other record predates the inspection
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Do not rely on a hearing alone to lift a vacate or padlock order. Confirm the active agency restriction and required remedy.
  • Document that the prohibited occupancy or access has ceased, and arrange any required permits, inspections, corrections and formal agency lift.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • door/exit photographs and approved egress plans
  • original vacate/padlock order and service history
  • agency correspondence, modification or lifting documents
  • dated photographs and occupant/access records for the cited areas
  • approved plans, permits and inspections supporting the corrective work

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039207299P, Building Violation LLC can scope vacate-order research, hearing response and a coordinated order-lift/correction plan after reviewing the actual notice and current DOB/OATH record.

Request help with vacate or padlock order at 17 Essex Street, Manhattan, NY 10002
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 17 Essex Street, Manhattan, NY 10002 — not just the summons number

For this property, start with facade / exterior wall safety and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.
  • Vacate or padlock order (1 source summons): Vacate-order research, hearing response and a coordinated order-lift/correction plan.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 10, 2026, December 17, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.