NYC DOB / ECB / OATH hearings · verified property resolution

1911 White Plains Road, Bronx, NY 10462 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 1911 White Plains Road, Bronx, NY 10462 and source-listed date December 18, 2026. Recorded concerns include facade / exterior wall safety, construction fence / site protection. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safetyConstruction fence / site protection

Verified premises, hearing and enforcement snapshot

Verified premises address
1911 White Plains Road, Bronx, NY 10462
Borough
Bronx
BIN
2047848
BBL
2042540039
Source summonses
2
Hearing dates in source
December 18, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1911 through 1913 WHITE PLAINS ROAD; 1923 WHITE PLAINS ROAD

Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What is the December 2026 OATH hearing for at 1911 White Plains Road, Bronx, NY 10462?

The uploaded record lists 2 summonses, including 039207083X (facade / exterior wall safety), 039207082Y (construction fence / site protection). The source-listed hearing date: December 18, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39207083X
039207083X
8:30 AM
CLASS - 2Facade / exterior wall safetyPENDING
39207082Y
039207082Y
10:30 AM
CLASS - 2Construction fence / site protectionPENDING

How the 2 recorded summonses relate at 1911 White Plains Road, Bronx, NY 10462

The verified property matching links 2 distinct summonses to 1911 White Plains Road, Bronx, NY 10462. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Construction fence / site protection (1): source summons 039207082Y. Check this charge separately, even when its documents can be gathered with other property records.

Facade / exterior wall safety (1): source summons 039207083X. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list October 7, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39207083X

Normalized ten-character lookup: 039207083X (infraction 202)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: front exposure.

Inspector narrative as preserved in source data

OBSERVED A LARGE AMOUNT OF DEBRIS IS SCATTERED & STORED AT THE FRONT YARD AREA ALONG THE LEFT SIDE ADJACENT PROPERTY EXTERIOR WALL., REPAIR AND/OR REPLACE

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1911 White Plains Road, Bronx, NY 10462

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “OBSERVED A LARGE AMOUNT OF DEBRIS IS SCATTERED & STORED AT THE FRONT YARD AREA ALONG THE LEFT SIDE ADJACENT PROPERTY EXTERIOR WALL., REPAIR AND/OR REPLACE”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039207083X.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039207083X, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 1911 White Plains Road, Bronx, NY 10462
Summons 2 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39207082Y

Normalized ten-character lookup: 039207082Y (infraction 211)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: front exposure, construction fence or enclosure, electrical installation.

Inspector narrative as preserved in source data

OBSERVED TEMP. CONST. FENCE ERECTED AT FRONT OF SITE UNDER ACTIVE PERMIT # X00931765-S2-FN IS MISSING THE INFO PANEL, VIEWING PANEL CUTOUT MISSING PLEXI-GLASS & PANELS COVERED IN GRAFFITI., COMPLY WITH CODE

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Issue date
October 7, 2026
Service date
October 7, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,000.00
Balance field in extract
$1,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 1911 White Plains Road, Bronx, NY 10462

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: front exposure, construction fence or enclosure, electrical installation. Record-specific inspection detail: Inspector text begins: “OBSERVED TEMP. CONST. FENCE ERECTED AT FRONT OF SITE UNDER ACTIVE PERMIT # X00931765-S2-FN IS MISSING THE INFO PANEL, VIEWING PANEL CUTOUT MISSING PLEXI-GL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039207082Y.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • front-exposure photos showing the area alleged
  • site-fence photos, dimensions and inspection log
  • licensed electrician report and electrical filing history
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039207082Y, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 1911 White Plains Road, Bronx, NY 10462
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 1911 White Plains Road, Bronx, NY 10462 — not just the summons number

For this property, start with facade / exterior wall safety and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.
  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 18, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.