The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 2 Cliff Street, Manhattan, NY 10038 and source-listed date December 31, 2026. Recorded concerns include facade / exterior wall safety, work contrary to approved plans. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Facade / exterior wall safetyWork contrary to approved plans
Verified premises, hearing and enforcement snapshot
Verified premises address
2 Cliff Street, Manhattan, NY 10038
Borough
Manhattan
BIN
1001167
BBL
1000750030
Source summonses
3
Hearing dates in source
December 31, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 103 through 119 JOHN STREET; 2 through 16 CLIFF STREET; 239 through 241 PEARL STREET
Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 2 Cliff Street, Manhattan, NY 10038?
The uploaded record lists 3 summonses, including 039560925K (facade / exterior wall safety), 039560926M (work contrary to approved plans), 039560927Y (facade / exterior wall safety). The source-listed hearing date: December 31, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 2 Cliff Street, Manhattan, NY 10038
The verified property matching links 3 distinct summonses to 2 Cliff Street, Manhattan, NY 10038. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Facade / exterior wall safety (2): source summons 039560925K, 039560927Y. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Work contrary to approved plans (1): source summons 039560926M. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 3 summonses list October 22, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
26 STORY ALT2 FACADE WORK ACTIVE SITE. OBSERVED OUTRIGGER BEAMS INSTALLED AT EXP#1,2,4. UPON REQUEST TO RIGGER FORMAN & QPSS FOR OUTRIGGER NOTIFICATION TO THE D.O.B. NONE PROVIDED, UPON RESERCH ON DOB RECORDS,
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
261 — BC 3314.1.1 & 27-1050.1 FAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST. OFF C-HOO
Issue date
October 22, 2026
Service date
October 22, 2026
Source severity
CLASS - 2
Source violation type
Cranes and Derricks
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 2 Cliff Street, Manhattan, NY 10038
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “26 STORY ALT2 FACADE WORK ACTIVE SITE. OBSERVED OUTRIGGER BEAMS INSTALLED AT EXP#1,2,4. UPON REQUEST TO RIGGER FORMAN & QPSS FOR OUTRIGGER NOTIFICATION TO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560925K.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
photographs by elevation and facade professional repair reports
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560925K, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
The record alleges work that differs from DOB-approved documents or amendments. Key locations/components named in the source: garage or parking area, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
26 STORYALT2 FACADE WORK ACTIVE SITE. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS (SSP)/CODE. SSP NOT PHASED SHOWS SHED TO BE INSTALLED AT EXP#3 PARKING LOT. SHED NOT INSTALLED AS PER APPROVED PLANS. FACADE EXT
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
282 — 28-105.12.2 WRK DOESN'T CONFORM TO APPROV DOCS AND/OR APPROV AMENDMENTS
Issue date
October 22, 2026
Service date
October 22, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 2 Cliff Street, Manhattan, NY 10038
Identify the application number, approval set, revision history and exactly which constructed conditions the inspector says differ. Key locations/components named in the source: garage or parking area, exterior masonry. Record-specific inspection detail: Inspector text begins: “26 STORYALT2 FACADE WORK ACTIVE SITE. OBSERVED WORK CONTRARY TO SITE SAFETY PLANS (SSP)/CODE. SSP NOT PHASED SHOWS SHED TO BE INSTALLED AT EXP#3 PARKING LO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560926M.
Whether the cited plans were the operative approved set on the inspection date
Whether an approved amendment, phased work or as-built record covers the observed condition
Whether the alleged difference is accurately described and located
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Compare field conditions with approved documents through a registered design professional.
Where necessary, amend plans, correct nonconforming work and arrange required permits/inspections before DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
parking/site-plan approvals and photos of the cited use
photographs by elevation and facade professional repair reports
approved plans, amendments and application history
current as-built measurements or professional field report
dated construction photographs and contractor records
inspection and sign-off documents
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560926M, Building Violation LLC can scope approved-plan discrepancy review and amendment/permit coordination after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: balcony or terrace, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
26 STORY ALT2 FACADE WORK ACTIVE SITE. OBSERVED ON 22 FL EXP#2,4 PERSONEL IN OFFICE SPACES WITH ACCESS TO SETBACKS. NO SIGNAGE ON TERRACE DOORS TO PREVENT PERSONELL FROM ACCESS TO SETBACKS WHERE EQUIPMENT INSTA
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2F7 — BC 3301.7 (2014 CODE) FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 3
Issue date
October 22, 2026
Service date
October 22, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 2 Cliff Street, Manhattan, NY 10038
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: balcony or terrace, exterior masonry. Record-specific inspection detail: Inspector text begins: “26 STORY ALT2 FACADE WORK ACTIVE SITE. OBSERVED ON 22 FL EXP#2,4 PERSONEL IN OFFICE SPACES WITH ACCESS TO SETBACKS. NO SIGNAGE ON TERRACE DOORS TO PREVENT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039560927Y.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
balcony/terrace photos, waterproofing or structural records
photographs by elevation and facade professional repair reports
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039560927Y, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 2 Cliff Street, Manhattan, NY 10038 — not just the summons number
For this property, start with facade / exterior wall safety and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work contrary to approved plans (1 source summons): Approved-plan discrepancy review and amendment/permit coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 31, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.