2 Decatur Street, Brooklyn, NY 11216 — Facade / exterior wall safety and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 2 Decatur Street, Brooklyn, NY 11216 and source-listed date December 23, 2026. Recorded concerns include facade / exterior wall safety, fire escape / exit obstruction. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Verified premises, hearing and enforcement snapshot
Verified premises address
2 Decatur Street, Brooklyn, NY 11216
Borough
Brooklyn
BIN
3053645
BBL
3018570033
Source summonses
2
Hearing dates in source
December 23, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 1449 through 1457 FULTON STREET; 2 through 10 DECATUR STREET; 495 through 497 TOMPKINS AVENUE
Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 2 Decatur Street, Brooklyn, NY 11216?
The uploaded record lists 2 summonses, including 039207586H (facade / exterior wall safety), 039207587J (fire escape / exit obstruction). The source-listed hearing date: December 23, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 2 recorded summonses relate at 2 Decatur Street, Brooklyn, NY 11216
The verified property matching links 2 distinct summonses to 2 Decatur Street, Brooklyn, NY 11216. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Facade / exterior wall safety (1): source summons 039207586H. Check this charge separately, even when its documents can be gathered with other property records.
Fire escape / exit obstruction (1): source summons 039207587J. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list October 9, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: front exposure, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. ATOI, OBSERVED THE EXTERIOR FACADE AT EXP 1, 2, AND 4 BRICK WALL/PARAPET/CORNICE/SILLS/LINTELS ARE CRACKED, LOOSE, & DETERIORATED W/STRESS CRACKING RUNNING
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
Issue date
October 9, 2026
Service date
October 13, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 2 Decatur Street, Brooklyn, NY 11216
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: front exposure, exterior masonry. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. ATOI, OBSERVED THE EXTERIOR FACADE AT EXP 1, 2, AND 4 BRICK WALL/PARAPET/CORNICE/SILLS/LINTELS ARE C…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207586H.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
photographs by elevation and facade professional repair reports
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207586H, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: fire escape, construction fence or enclosure.
Inspector narrative as preserved in source data — potentially incomplete
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE AT EXPOSURE 4 (FULTON ST. WOOD BRACING AND LOOSE DEBRIS IN THE VICINITY IMPEDE THE FIRE ESCAPE DROP DO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 9, 2026
Service date
October 13, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 2 Decatur Street, Brooklyn, NY 11216
Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: fire escape, construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE AT EXPOSURE 4 (FULTON ST. WOOD BRACING AND LOOS…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207587J.
Whether the cited route is a required exit component for this occupancy
Whether the alleged objects, locks or configuration actually affected required egress at the cited location
Whether the area and date are accurately identified and whether correction can be documented
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Remove hazards and restore required safe egress immediately.
When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
photos of the cited fire escape and relevant inspection or repair reports
site-fence photos, dimensions and inspection log
photographs of the exact door, stair, hall, landing or fire escape
approved floor and means-of-egress plans
repair/removal invoices and dated completion photographs
fire-escape or professional inspection and compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207587J, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 2 Decatur Street, Brooklyn, NY 11216 — not just the summons number
For this property, start with facade / exterior wall safety and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Fire escape / exit obstruction (1 source summons): Life-safety hearing preparation and egress correction coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 23, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.