Facade / exterior wall safety — ECB/OATH summons 39205443L
Normalized ten-character lookup: 039205443L (infraction 204)
Source allegation and actual cited law
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: exterior masonry.
Inspector narrative as preserved in source data
OBSERVED SOUTH ELEVATION(EXP#2)OBSERVE STEP CRACKS,DISPLACEMENT & DETERIORATING IN MASONRY FACADE BETWEEN THE EXPOSURES #1 AND #2, MAINTAIN EXTERIOR BUILDING WALL
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
- 204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
- Issue date
- September 24, 2026
- Service date
- September 24, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $2,500.00
- Balance field in extract
- $2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 2 South Pinehurst Avenue, Manhattan, NY 10033
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “OBSERVED SOUTH ELEVATION(EXP#2)OBSERVE STEP CRACKS,DISPLACEMENT & DETERIORATING IN MASONRY FACADE BETWEEN THE EXPOSURES #1 AND #2, MAINTAIN EXTERIOR BUILDI…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039205443L.
- Whether the specific facade element or inspection/report obligation was correctly identified
- Whether applicable inspection or FISP filings were submitted and accepted on time
- Whether a protective shed, hazard notice or unsafe-condition order applies separately
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
- Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- photographs by elevation and facade professional repair reports
- facade/critical-examination reports, amendments and acceptance receipts
- photographs with elevation/exposure labels and dated repair records
- QEW or design professional evaluations and DOB correspondence
- sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039205443L, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
Request help with facade / exterior wall safety at 2 South Pinehurst Avenue, Manhattan, NY 10033