21-39 27 Street, Queens, NY 11105 — Facade / exterior wall safety and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 21-39 27 Street, Queens, NY 11105 and source-listed dates December 15, 2026, December 22, 2026. Recorded concerns include facade / exterior wall safety, stop-work order / continued work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Facade / exterior wall safetyStop-work order / continued work
Verified premises, hearing and enforcement snapshot
Verified premises address
21-39 27 Street, Queens, NY 11105
Borough
Queens
BIN
4018294
BBL
4008570018
Source summonses
3
Hearing dates in source
December 15, 2026, December 22, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 21-39 27 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 21-39 27 Street, Queens, NY 11105?
The uploaded record lists 3 summonses, including 039207414L (facade / exterior wall safety), 039207514Z (stop-work order / continued work), 039207896N (facade / exterior wall safety). The source-listed hearing dates: December 15, 2026, December 22, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 21-39 27 Street, Queens, NY 11105
The verified property matching links 3 distinct summonses to 21-39 27 Street, Queens, NY 11105. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Facade / exterior wall safety (2): source summons 039207414L, 039207896N. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Stop-work order / continued work (1): source summons 039207514Z. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list October 9, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
More than one source-listed hearing date: December 15, 2026, December 22, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.
Mixed procedural statuses: ADMIT/IN-VIO: 1; PENDING: 2. Confirm the present status and decision for each ticket before preparing one combined response.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: cellar or basement area, front exposure, windows.
Inspector narrative as preserved in source data
AT FRONT OF BUILDING, AT LEFT SIDE, VERTICAL CRACK APPEARS AT CELLAR WINDOW., MAINTAIN EXTERIOR BUILDING WALL
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-39 27 Street, Queens, NY 11105
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: cellar or basement area, front exposure, windows. Record-specific inspection detail: Inspector text begins: “AT FRONT OF BUILDING, AT LEFT SIDE, VERTICAL CRACK APPEARS AT CELLAR WINDOW., MAINTAIN EXTERIOR BUILDING WALL”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207414L.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
front-exposure photos showing the area alleged
window photographs and approved facade or window work plans
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207414L, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
The record concerns an alleged stop-work-order violation, continued work or interference with a posted stop-work notice. Key locations/components named in the source: electrical installation, apartment or dwelling unit.
Inspector narrative as preserved in source data — potentially incomplete
PSWO AND ECB VIOLATION ISSUED FOR ELECTRICAL WORK BEING DONE IN APT A1. OBSERVED NEW CABLES AND BOXES INSTALLED FOR LIGHTS,SWITCHES AND OUTLETS. WORK 70% COMPLETE. STOP ALL ELECTRICAL WORK EXCEPT TO MAKE SITE S
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
October 9, 2026
Service date
October 9, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
ADMIT/IN-VIO
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$0.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-39 27 Street, Queens, NY 11105
Find the specific stop-work order, its geographic and work-scope restrictions, and the inspection dates. A partial stop-work order may not affect all work equally; the actual written order governs. Key locations/components named in the source: electrical installation, apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “PSWO AND ECB VIOLATION ISSUED FOR ELECTRICAL WORK BEING DONE IN APT A1. OBSERVED NEW CABLES AND BOXES INSTALLED FOR LIGHTS,SWITCHES AND OUTLETS. WORK 70% C…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207514Z.
Whether the work observed was covered by the order
Whether a rescission, partial lift, or approved authorization existed at the relevant time
Whether the cited act was construction activity, safety work permitted by the agency, or a different event
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Follow the operative stop-work order immediately and avoid unapproved work.
Identify underlying permit and safety defects; coordinate required corrective filings/inspections and a formal DOB lift where appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed electrician report and electrical filing history
approved unit layout and relevant lawful occupancy records
stop-work order and posted notice photographs
DOB permit and stop-work records including lift history
dated work logs, contractor schedules and site photos
approved corrective plans, L2/other DOB submission evidence where applicable
Outcome-style status in source: what to verify before acting
The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.
Need a summons-specific action plan? For 039207514Z, Building Violation LLC can scope stop-work-order research, hearing support and permit/lift coordination after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: cellar or basement area, front exposure, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
NOTED AT TIME OF INSPECTION: OBSERVED A VERTICAL CRACK THROUGH THE BRICK MASONRY AT THE BASEMENT LEVEL OF EXPOSURE #1, FRONT OF THE PROPERTY ALONG 27TH STREET, WITH LOOSE AND DETERIORATED MORTAR JOINTS. ADDITIO
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 14, 2026
Service date
October 14, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 21-39 27 Street, Queens, NY 11105
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: cellar or basement area, front exposure, exterior masonry. Record-specific inspection detail: Inspector text begins: “NOTED AT TIME OF INSPECTION: OBSERVED A VERTICAL CRACK THROUGH THE BRICK MASONRY AT THE BASEMENT LEVEL OF EXPOSURE #1, FRONT OF THE PROPERTY ALONG 27TH STR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039207896N.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
front-exposure photos showing the area alleged
photographs by elevation and facade professional repair reports
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039207896N, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 21-39 27 Street, Queens, NY 11105 — not just the summons number
For this property, start with facade / exterior wall safety and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Stop-work order / continued work (1 source summons): Stop-work-order research, hearing support and permit/lift coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 15, 2026, December 22, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.