NYC DOB / ECB / OATH hearings · verified property resolution

229 Waverly Avenue, Brooklyn, NY 11205 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 229 Waverly Avenue, Brooklyn, NY 11205 and source-listed dates December 2, 2026, December 16, 2026. Recorded concerns include facade / exterior wall safety, sidewalk shed / scaffolding, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safetySidewalk shed / scaffoldingSite safety / construction operations

Verified premises, hearing and enforcement snapshot

Verified premises address
229 Waverly Avenue, Brooklyn, NY 11205
Borough
Brooklyn
BIN
3399735
BBL
3019170018
Source summonses
3
Hearing dates in source
December 2, 2026, December 16, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 229 WAVERLY AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 229 Waverly Avenue, Brooklyn, NY 11205?

The uploaded record lists 3 summonses, including 039559862Y (facade / exterior wall safety), 039559858L (sidewalk shed / scaffolding), 039560340P (site safety / construction operations). The source-listed hearing dates: December 2, 2026, December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559862Y
039559862Y
9:30 AM
CLASS - 2Facade / exterior wall safetyPENDING
39559858L
039559858L
10:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING
39560340P
039560340P
9:30 AM
CLASS - 2Site safety / construction operationsPENDING

How the 3 recorded summonses relate at 229 Waverly Avenue, Brooklyn, NY 11205

The verified property matching links 3 distinct summonses to 229 Waverly Avenue, Brooklyn, NY 11205. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Facade / exterior wall safety (1): source summons 039559862Y. Check this charge separately, even when its documents can be gathered with other property records.

Sidewalk shed / scaffolding (1): source summons 039559858L. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039560340P. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 26, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Exterior-wall remediation and sidewalk-shed maintenance or permits are separate tracks even if the shed protects pedestrians from the same facade hazard.

More than one source-listed hearing date: December 2, 2026, December 16, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39559862Y

Normalized ten-character lookup: 039559862Y (infraction 217)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: sidewalk shed, electrical installation, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

UPON INSPECTION, OBSERVED SIDEWALK SHED INSTALLED AROUND THE JOBSITE PERIMETER WITHOUT THE REQUIRED PARAPET INFORMATION PANEL, IN VIOLATION OF BUILDING CODE 3301.9.2. REQUIRED SIDEWALK SHED PARAPET INFORMATION

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 217 — BC 3301.9,27-10009(C) FAIL TO PROVIDE/POST SIGN(S) AT JB SITE PURSUANT TO SUBSEC
Issue date
September 26, 2026
Service date
September 28, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 229 Waverly Avenue, Brooklyn, NY 11205

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: sidewalk shed, electrical installation, exterior masonry. Record-specific inspection detail: Inspector text begins: “UPON INSPECTION, OBSERVED SIDEWALK SHED INSTALLED AROUND THE JOBSITE PERIMETER WITHOUT THE REQUIRED PARAPET INFORMATION PANEL, IN VIOLATION OF BUILDING COD…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559862Y.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • licensed electrician report and electrical filing history
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559862Y, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 229 Waverly Avenue, Brooklyn, NY 11205
Summons 2 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39559858L

Normalized ten-character lookup: 039559858L (infraction 2P7)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

WEATHER ADVISORY, BC3314.01. DURING A PERIMETER INSPECTION JOBSITE INACTIVE, I OBSERVED SUPPORTED SCAFFOLD ALONG THE BUILDING PERIMETER WAS NOT ERECTED AND/OR MAINTAINED IN ACCORDANCE WITH APPLICABLE CODE REQU

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
September 26, 2026
Service date
September 28, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 229 Waverly Avenue, Brooklyn, NY 11205

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “WEATHER ADVISORY, BC3314.01. DURING A PERIMETER INSPECTION JOBSITE INACTIVE, I OBSERVED SUPPORTED SCAFFOLD ALONG THE BUILDING PERIMETER WAS NOT ERECTED AND…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559858L.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559858L, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 229 Waverly Avenue, Brooklyn, NY 11205
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39560340P

Normalized ten-character lookup: 039560340P (infraction 2P7)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

B.C 3301.1 B.C 3301.2 FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. OBSERVED THROUGHOUT THE ENTIRE SITE HOLES BIGGER THAN 2" IN THE CONCRETE FLOORING LEFT UNCOVERED CREATING

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
October 8, 2026
Service date
October 8, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 229 Waverly Avenue, Brooklyn, NY 11205

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “B.C 3301.1 B.C 3301.2 FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. OBSERVED THROUGHOUT THE ENTIRE SITE HOLES BIGGER TH…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560340P.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560340P, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 229 Waverly Avenue, Brooklyn, NY 11205
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 229 Waverly Avenue, Brooklyn, NY 11205 — not just the summons number

For this property, start with facade / exterior wall safety and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.
  • Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.
  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 2, 2026, December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.