NYC DOB / ECB / OATH hearings · verified property resolution

234 East 204 Street, Bronx, NY 10458 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 234 East 204 Street, Bronx, NY 10458 and source-listed date December 4, 2026. Recorded concerns include site safety / construction operations, facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsFacade / exterior wall safety

Verified premises, hearing and enforcement snapshot

Verified premises address
234 East 204 Street, Bronx, NY 10458
Borough
Bronx
BIN
2017269
BBL
2033090018
Source summonses
4
Hearing dates in source
December 4, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 234 EAST 204 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 234 East 204 Street, Bronx, NY 10458?

The uploaded record lists 4 summonses, including 039559572X (site safety / construction operations), 039559573H (facade / exterior wall safety), 039559571Y (site safety / construction operations), 039559582J (site safety / construction operations). The source-listed hearing date: December 4, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559572X
039559572X
8:30 AM
CLASS - 1Site safety / construction operationsPENDING
39559573H
039559573H
9:30 AM
CLASS - 1Facade / exterior wall safetyPENDING
39559571Y
039559571Y
10:30 AM
CLASS - 1Site safety / construction operationsPENDING
39559582J
039559582J
10:30 AM
CLASS - 1Site safety / construction operationsPENDING

How the 4 recorded summonses relate at 234 East 204 Street, Bronx, NY 10458

The verified property matching links 4 distinct summonses to 234 East 204 Street, Bronx, NY 10458. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Site safety / construction operations (3): source summons 039559572X, 039559571Y, 039559582J. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Facade / exterior wall safety (1): source summons 039559573H. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 4 summonses list September 24, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559572X

Normalized ten-character lookup: 039559572X (infraction 1P7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

ATIO 3-STORY BUILDING UNDER FULL DEMOLITION, UPON REVIEW OF THE CONSTRUCTION SUPERINTENDENT'S LOGBOOK, I OBSERVED THE SUPERINTENDENT CONTINUED SIGNING DAILY ENTRIES THROUGH 8/27/2026 UNTIL 9/16/2026. THE LICENS

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1P7
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 234 East 204 Street, Bronx, NY 10458

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “ATIO 3-STORY BUILDING UNDER FULL DEMOLITION, UPON REVIEW OF THE CONSTRUCTION SUPERINTENDENT'S LOGBOOK, I OBSERVED THE SUPERINTENDENT CONTINUED SIGNING DAIL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559572X.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559572X, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 234 East 204 Street, Bronx, NY 10458
Summons 2 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39559573H

Normalized ten-character lookup: 039559573H (infraction 115)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF A 3-STORY BUILDING UNDER FULL DEMOLITION, I OBSERVED WORKERS ON THE 2ND FLOOR AT THE LEADING EDGE WITH NO PARAPET WALL IN PLACE, FAILURE TO PROVIDE GUARDRAIL FOR FALL PROTECTION, WORKER

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 115 — BC 3301.2,27-1009(A) FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 234 East 204 Street, Bronx, NY 10458

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF A 3-STORY BUILDING UNDER FULL DEMOLITION, I OBSERVED WORKERS ON THE 2ND FLOOR AT THE LEADING EDGE WITH NO PARAPET WALL IN PLACE, F…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559573H.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559573H, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 234 East 204 Street, Bronx, NY 10458
Summons 3 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559571Y

Normalized ten-character lookup: 039559571Y (infraction 116)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: structural framing.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF INSPECTION OF A 3-STORY BUILDING UNDERGOING FULL DEMOLITION, APPROXIMATELY 75% OF THE STRUCTURE HAD ALREADY BEEN DEMOLISHED. I RESEARCH OF DOB RECORDS REVEALED NO NOTIFICATION FOR THE DEMOLITION

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 116 — BC 3306.3,27-195 FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 234 East 204 Street, Bronx, NY 10458

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: structural framing. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION OF A 3-STORY BUILDING UNDERGOING FULL DEMOLITION, APPROXIMATELY 75% OF THE STRUCTURE HAD ALREADY BEEN DEMOLISHED. I RESEARCH OF D…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559571Y.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559571Y, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 234 East 204 Street, Bronx, NY 10458
Summons 4 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559582J

Normalized ten-character lookup: 039559582J (infraction 191)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

( 28-401.1 & 28-401.12 ) AT THE TIME OF INSPECTION OF A 3-STORY BUILDING UNDER FULL DEMOLITION, UPON REVIEW OF THE C.S LOGBOOK, I OBSERVED THE C.S CONTINUED SIGNING DAILY ENTRIES THROUGH 8/27/2026 UNTIL 9/16/20

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 191 — MISC. CHAPTER 4 OF TITLE 28-UNLICENSED ACTIVITY ILLEGALLY ENGAGING IN ANY BUSINESS OR OCCUPATION WITHOUT A REQUIRED LI
Issue date
September 24, 2026
Service date
September 24, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 234 East 204 Street, Bronx, NY 10458

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “( 28-401.1 & 28-401.12 ) AT THE TIME OF INSPECTION OF A 3-STORY BUILDING UNDER FULL DEMOLITION, UPON REVIEW OF THE C.S LOGBOOK, I OBSERVED THE C.S CONTINUE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559582J.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559582J, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 234 East 204 Street, Bronx, NY 10458
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 234 East 204 Street, Bronx, NY 10458 — not just the summons number

For this property, start with site safety / construction operations and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (3 source summonses): Construction safety hearing preparation and contractor/site-safety coordination.
  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 4, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.