NYC DOB / ECB / OATH hearings · verified property resolution

245-249 East 110 Street, Manhattan, NY 10029 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 245-249 East 110 Street, Manhattan, NY 10029 and source-listed dates December 28, 2026, December 31, 2026. Recorded concerns include facade / exterior wall safety, certificate of correction / order noncompliance, sidewalk shed / scaffolding. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safetyCertificate of Correction / order noncomplianceSidewalk shed / scaffolding

Verified premises, hearing and enforcement snapshot

Verified premises address
245-249 East 110 Street, Manhattan, NY 10029
Borough
Manhattan
BIN
1052463
BBL
1016600019
Source summonses
3
Hearing dates in source
December 28, 2026, December 31, 2026
Source snapshot
November 10, 2026
Address verification method
Prior verified BIN

Official PAD aliases and building ranges: 245 through 249 EAST 110 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: 2 default-status record(s) in the source; one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 245-249 East 110 Street, Manhattan, NY 10029?

The uploaded record lists 3 summonses, including 039143705L (facade / exterior wall safety), 039143706N (certificate of correction / order noncompliance), 039561095P (sidewalk shed / scaffolding). The source-listed hearing dates: December 28, 2026, December 31, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39143705L
039143705L
9:00 AM
CLASS - 1Facade / exterior wall safetyDEFAULT
39143706N
039143706N
9:00 AM
CLASS - 1Certificate of Correction / order noncomplianceDEFAULT
39561095P
039561095P
10:30 AM
CLASS - 2Sidewalk shed / scaffoldingPENDING

How the 3 recorded summonses relate at 245-249 East 110 Street, Manhattan, NY 10029

The verified property matching links 3 distinct summonses to 245-249 East 110 Street, Manhattan, NY 10029. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Certificate of Correction / order noncompliance (1): source summons 039143706N. Check this charge separately, even when its documents can be gathered with other property records.

Facade / exterior wall safety (1): source summons 039143705L. Check this charge separately, even when its documents can be gathered with other property records.

Sidewalk shed / scaffolding (1): source summons 039561095P. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list April 2, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Exterior-wall remediation and sidewalk-shed maintenance or permits are separate tracks even if the shed protects pedestrians from the same facade hazard.

More than one source-listed hearing date: December 28, 2026, December 31, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Mixed procedural statuses: DEFAULT: 2; PENDING: 1. Confirm the present status and decision for each ticket before preparing one combined response.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39143705L

Normalized ten-character lookup: 039143705L (infraction 102)

November 10 source-listed hearing9:00 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

NOTED ON EXP 4 4TH FL FACADE BLDG. HAS SEVERE CRACKING WITH A SECTION OF FACADE DISLODGED. PREVIOUSLY CITED MULTI VIO SUCH AS VIO# 39126397Y. OWNER ORDERED FINISH REPAIR 4/3/25 AND HAS NOT BEGUN WORK OR REPAIR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
April 2, 2025
Service date
April 2, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 245-249 East 110 Street, Manhattan, NY 10029

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “NOTED ON EXP 4 4TH FL FACADE BLDG. HAS SEVERE CRACKING WITH A SECTION OF FACADE DISLODGED. PREVIOUSLY CITED MULTI VIO SUCH AS VIO# 39126397Y. OWNER ORDERED…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039143705L.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Default recorded in source: what to verify before acting

A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.

Need a summons-specific action plan? For 039143705L, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 245-249 East 110 Street, Manhattan, NY 10029
Summons 2 of the source-linked property

Certificate of Correction / order noncompliance — ECB/OATH summons 39143706N

Normalized ten-character lookup: 039143706N (infraction 187)

November 10 source-listed hearing9:00 AM

Source allegation and actual cited law

DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. Key locations/components named in the source: exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO COMPLY COMMISIONERS ORDER #120324FEU11102AK TO APPLY FOR PERMIT BY 1/3 AND COMPLETE WORK BY 4/3 TO REPAIR UNSAFE FACADE PLUS HIRE A NYSPE AND SUMMIT ENGINEERS REPORT ON UNSAFE CONDITIONS. NO PERMIT F

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
Issue date
April 2, 2025
Service date
April 2, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$25,000.00
Balance field in extract
$25,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 245-249 East 110 Street, Manhattan, NY 10029

Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY COMMISIONERS ORDER #120324FEU11102AK TO APPLY FOR PERMIT BY 1/3 AND COMPLETE WORK BY 4/3 TO REPAIR UNSAFE FACADE PLUS HIRE A NYSPE AND SU…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039143706N.

  • Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
  • Whether the prior order references the correct premises and responsible party
  • Whether the earlier cited condition has been corrected and what current DOB closeout record shows
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Retrieve the original violation, deadline and agency compliance requirements.
  • Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs by elevation and facade professional repair reports
  • underlying summons, order and deadline notice
  • DOB Certificate of Correction filings and acknowledgments
  • before/after dated photographs and signed affidavits where required
  • contractor or licensed-professional invoices and sign-offs

Default recorded in source: what to verify before acting

A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.

Need a summons-specific action plan? For 039143706N, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.

Request help with certificate of correction / order noncompliance at 245-249 East 110 Street, Manhattan, NY 10029
Summons 3 of the source-linked property

Sidewalk shed / scaffolding — ECB/OATH summons 39561095P

Normalized ten-character lookup: 039561095P (infraction 2P8)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB cites a sidewalk shed, scaffolding or overhead pedestrian-protection condition. Key locations/components named in the source: sidewalk shed.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION, A 6-STORY BUILDING WITH A SIDEWALK SHED WAS OBSERVED. SHED PERMIT #M01076518-I1-SH EXPIRED ON 7/15/2025. NO WORK WAS OBSERVED. THE EXPIRED PERMIT POSE A SAFETY RISK TO THE PUBLIC.

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2P8
Issue date
October 27, 2026
Service date
October 27, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 245-249 East 110 Street, Manhattan, NY 10029

Identify the shed location, permit status, structural or dimensional defect and any underlying facade or construction work that makes protection necessary. Key locations/components named in the source: sidewalk shed. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION, A 6-STORY BUILDING WITH A SIDEWALK SHED WAS OBSERVED. SHED PERMIT #M01076518-I1-SH EXPIRED ON 7/15/2025. NO WORK WAS OBSERVED. THE E…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039561095P.

  • Whether the cited structure was installed, permitted or maintained as described
  • Whether the alleged defect existed at the stated location and date
  • Whether the shed was required to remain because of a separate unresolved condition
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have dangerous installations assessed and secured promptly by a qualified contractor or professional.
  • Coordinate shed repair/removal permits and any underlying unsafe facade or construction closeout before requesting final removal.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • sidewalk shed/rigging permits and approved drawings
  • dated exposure-level photographs and inspection logs
  • scaffold or shed contractor maintenance and repair records
  • underlying facade notices, permits and DOB sign-offs where relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039561095P, Building Violation LLC can scope sidewalk-shed/scaffold hearing support and corrective work coordination after reviewing the actual notice and current DOB/OATH record.

Request help with sidewalk shed / scaffolding at 245-249 East 110 Street, Manhattan, NY 10029
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 245-249 East 110 Street, Manhattan, NY 10029 — not just the summons number

For this property, start with facade / exterior wall safety and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.
  • Certificate of Correction / order noncompliance (1 source summons): Underlying-case research, correction paperwork and DOB compliance closeout.
  • Sidewalk shed / scaffolding (1 source summons): Sidewalk-shed/scaffold hearing support and corrective work coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 28, 2026, December 31, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.