35-18 Leavitt Street, Queens, NY 11354 — Unsafe condition / maintenance and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 35-18 Leavitt Street, Queens, NY 11354 and source-listed date December 1, 2026. Recorded concerns include unsafe condition / maintenance, facade / exterior wall safety, site safety / construction operations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Verified premises, hearing and enforcement snapshot
Verified premises address
35-18 Leavitt Street, Queens, NY 11354
Borough
Queens
BIN
4112161
BBL
4049600027
Source summonses
3
Hearing dates in source
December 1, 2026
Source snapshot
November 10, 2026
Address verification method
OATH normalized summons
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 35-18 Leavitt Street, Queens, NY 11354?
The uploaded record lists 3 summonses, including 039550251Y (unsafe condition / maintenance), 039553240M (facade / exterior wall safety), 039553241Y (site safety / construction operations). The source-listed hearing date: December 1, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 3 recorded summonses relate at 35-18 Leavitt Street, Queens, NY 11354
The verified property matching links 3 distinct summonses to 35-18 Leavitt Street, Queens, NY 11354. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Facade / exterior wall safety (1): source summons 039553240M. Check this charge separately, even when its documents can be gathered with other property records.
Site safety / construction operations (1): source summons 039553241Y. Check this charge separately, even when its documents can be gathered with other property records.
Unsafe condition / maintenance (1): source summons 039550251Y. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 2 summonses list April 21, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
DOB alleges a failure to maintain a building component in code-compliant or safe condition. The exact cited location/component should be confirmed against the original inspection record.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED CLOSED 5STORY NB. ICY/SNOW CONDITIONS WERE OBSERVED ON PEDESTRIAN WALKWAY @ CORNER OF EXPO1&4, CREATING SLIP/FALL HAZARDS FOR PEDESTRIANS. SNOW/ICY CONDITIONS HAVE NOT BEEN CLEARED IN ORDER TO MAINTAIN
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P7
Issue date
February 11, 2026
Service date
February 11, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 35-18 Leavitt Street, Queens, NY 11354
A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “OBSERVED CLOSED 5STORY NB. ICY/SNOW CONDITIONS WERE OBSERVED ON PEDESTRIAN WALKWAY @ CORNER OF EXPO1&4, CREATING SLIP/FALL HAZARDS FOR PEDESTRIANS. SNOW/IC…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039550251Y.
Whether the exact physical condition and location existed on the inspection date
Whether the cited component and applicable maintenance standard were correctly identified
Whether repairs, inspections or other contemporaneous records change the factual assessment
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
time-stamped photographs of the specific alleged condition
maintenance and repair tickets, invoices and professional findings
prior complaints, reports and permit history where relevant
dated post-correction photographs and agency compliance records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039550251Y, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: roof or rooftop, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
BC 3314.1 5-STORY BUILDING ACTIVE JOB SITE, PIPE SCAFFOLDS AT EXP# 1, 3, 4, AND ROOF LEVEL WERE NOT MAINTAINED, WITH LOOSE PLANKING, MISSING PINS, AND DEBRIS NETTING NOT SECURED TO THE FACADE. THIS CONDITION IS
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
2P7
Issue date
April 21, 2026
Service date
April 21, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 35-18 Leavitt Street, Queens, NY 11354
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: roof or rooftop, exterior masonry. Record-specific inspection detail: Inspector text begins: “BC 3314.1 5-STORY BUILDING ACTIVE JOB SITE, PIPE SCAFFOLDS AT EXP# 1, 3, 4, AND ROOF LEVEL WERE NOT MAINTAINED, WITH LOOSE PLANKING, MISSING PINS, AND DEBR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039553240M.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
photographs by elevation and facade professional repair reports
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039553240M, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. Key locations/components named in the source: roof or rooftop, rear exposure or yard.
Inspector narrative as preserved in source data — potentially incomplete
AT THE TIME OF INSPECTION OF A 5-STORY BUILDING ACTIVE JOB SITE, AT EXP# 2, ROOF PROTECTION WAS NOT PROVIDED. ADDITIONALLY, OVERHEAD PROTECTION AT THE REAR YARD WAS MISSING. THIS CONDITION CREATES A HAZARD TO T
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
1P3
Issue date
April 21, 2026
Service date
April 21, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 35-18 Leavitt Street, Queens, NY 11354
Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. Key locations/components named in the source: roof or rooftop, rear exposure or yard. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION OF A 5-STORY BUILDING ACTIVE JOB SITE, AT EXP# 2, ROOF PROTECTION WAS NOT PROVIDED. ADDITIONALLY, OVERHEAD PROTECTION AT THE REAR…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039553241Y.
Whether construction was underway and the cited safety duty applied at the relevant time
Whether required postings, logs, plans or supervision were in place
Whether the cited conditions or documents belonged to this job site and respondent
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Correct active site hazards immediately and involve the qualified site safety/contractor team.
Update required plans, safety controls, postings, inspections or records and document remediation.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated roof photographs and any roofing/equipment permit documents
rear-exposure photos tied to the inspection date
site safety plan, permits and approved construction documents
daily inspection logs, toolbox talks and supervisory assignments
dated job-site photos with exposure or floor
contractor correction records and agency inspection reports
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039553241Y, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 35-18 Leavitt Street, Queens, NY 11354 — not just the summons number
For this property, start with unsafe condition / maintenance and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 1, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.