42 Pleasant Valley Avenue, Staten Island, NY 10304 — Work without a permit and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 5 DOB/ECB/OATH summonses with 42 Pleasant Valley Avenue, Staten Island, NY 10304 and source-listed date December 8, 2026. Recorded concerns include work without a permit, unpermitted electrical work, facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work without a permitUnpermitted electrical workFacade / exterior wall safety
Verified premises, hearing and enforcement snapshot
Verified premises address
42 Pleasant Valley Avenue, Staten Island, NY 10304
Borough
Staten Island
BIN
5016039
BBL
5006220086
Source summonses
5
Hearing dates in source
December 8, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 42 PLEASANT VALLEY AVENUE
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: 5 default-status record(s) in the source; one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 42 Pleasant Valley Avenue, Staten Island, NY 10304?
The uploaded record lists 5 summonses, including 039165114R (work without a permit), 039165115Z (unpermitted electrical work), 039165116K (facade / exterior wall safety), 039165117M (work without a permit) and additional tickets. The source-listed hearing date: December 8, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 5 recorded summonses relate at 42 Pleasant Valley Avenue, Staten Island, NY 10304
The verified property matching links 5 distinct summonses to 42 Pleasant Valley Avenue, Staten Island, NY 10304. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Work without a permit (3): source summons 039165114R, 039165117M, 039165125M. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.
Facade / exterior wall safety (1): source summons 039165116K. Check this charge separately, even when its documents can be gathered with other property records.
Unpermitted electrical work (1): source summons 039165115Z. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 5 summonses list October 28, 2025 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work without a permit — ECB/OATH summons 39165114R
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: front exposure.
Inspector narrative as preserved in source data — potentially incomplete
ATOI OBSERVED ENTIRE 3 STORY HOUSE GUTTED TO STUDS AND SUBFLOOR. NEW PLYWOOD SUBFLOOR BEING INSTALLED. TOP FLOOR SHIMMIMG OR FLOOR WAS IN PROGRESS. APPROX 8 MEN WORKING ONSITE. 30 YARD CONTAINER IN FRONT OF HOU
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 28, 2025
Service date
October 28, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 42 Pleasant Valley Avenue, Staten Island, NY 10304
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED ENTIRE 3 STORY HOUSE GUTTED TO STUDS AND SUBFLOOR. NEW PLYWOOD SUBFLOOR BEING INSTALLED. TOP FLOOR SHIMMIMG OR FLOOR WAS IN PROGRESS. APPROX…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039165114R.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039165114R, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: cellar or basement area, electrical installation.
Inspector narrative as preserved in source data
ATOI OBSERVED MAJORITY OF ELECTRIC REMOVED FROM HOUSE. HOUSE HAS BEEN GUTTED. PANELS IN CELLAR OPEN WITH NO COVERS., OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
1C9 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
October 28, 2025
Service date
October 28, 2025
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$1,630.00
Balance field in extract
$1,630.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 42 Pleasant Valley Avenue, Staten Island, NY 10304
Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: cellar or basement area, electrical installation. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED MAJORITY OF ELECTRIC REMOVED FROM HOUSE. HOUSE HAS BEEN GUTTED. PANELS IN CELLAR OPEN WITH NO COVERS., OBTAIN PERMIT”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039165115Z.
Whether the cited work required an electrical permit at the relevant time
Whether a licensed electrician had already filed, inspected or signed off the cited work
Whether the described installation is correctly located and attributed
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed electrician report and electrical filing history
electrical permit/job history and inspection results
licensed electrician invoices, test reports and sign-offs
dated photos of panels, circuits or fixtures referenced
approved electrical drawings and DOB correspondence
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039165115Z, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: front exposure, exterior masonry.
Inspector narrative as preserved in source data
ATOI OBSERVED VERY LARGE PILE OF MASONRY/ BRICK DEBRIS IN THE FRONT YARD. BRICKS ARE FROM OLD VENEER BRICK SIDING. APPROX 20 YDS., REPAIR AND/REPLACE
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 28, 2025
Service date
October 28, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 42 Pleasant Valley Avenue, Staten Island, NY 10304
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: front exposure, exterior masonry. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED VERY LARGE PILE OF MASONRY/ BRICK DEBRIS IN THE FRONT YARD. BRICKS ARE FROM OLD VENEER BRICK SIDING. APPROX 20 YDS., REPAIR AND/REPLACE”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039165116K.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
photographs by elevation and facade professional repair reports
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039165116K, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: gas or boiler equipment.
Inspector narrative as preserved in source data
ATOI OBSERVED MAJORITY OF PLUMBING WAS REMOVED FROM THE HOUSE. GAS LINE VLAVE CLOSED BUT UNCAPPED. WATER LINES REMOVED, SOME OLD GALVANIZED LINES REMAIN AT SECOND FLOOR EXP 2., OBTAIN PERMIT
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 28, 2025
Service date
October 28, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 42 Pleasant Valley Avenue, Staten Island, NY 10304
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: gas or boiler equipment. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED MAJORITY OF PLUMBING WAS REMOVED FROM THE HOUSE. GAS LINE VLAVE CLOSED BUT UNCAPPED. WATER LINES REMOVED, SOME OLD GALVANIZED LINES REMAIN AT…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039165117M.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
licensed-trade test results and equipment/permit records
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039165117M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: front exposure, structural framing.
Inspector narrative as preserved in source data — potentially incomplete
ATOI OBSERVED UNPERMITED/UNDOCUMENTED STURCTURAL WORK. AT 2ND FL EXP 1 WALL REMOVED AND REPLACED BY A STEEL BEAM. SIZE OF BEAM, BEARING, SUPPORT AT WALLS AND FOUNDAITION UNKNOWN. NO VISIABLE CONNECTIONS TO WOOD
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 28, 2025
Service date
October 28, 2025
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
DEFAULT
DOB/ECB status in extract
ACTIVE
Correction certification in extract
NO COMPLIANCE RECORDED
Penalty field in extract
$2,530.00
Balance field in extract
$2,530.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 42 Pleasant Valley Avenue, Staten Island, NY 10304
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: front exposure, structural framing. Record-specific inspection detail: Inspector text begins: “ATOI OBSERVED UNPERMITED/UNDOCUMENTED STURCTURAL WORK. AT 2ND FL EXP 1 WALL REMOVED AND REPLACED BY A STEEL BEAM. SIZE OF BEAM, BEARING, SUPPORT AT WALLS A…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039165125M.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
approved framing plans and structural engineer assessment
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Default recorded in source: what to verify before acting
A DEFAULT entry can affect procedural options; determine when and how default was entered and consult official OATH rules about any available vacate-default application. Do not assume the source-listed December date is still a live hearing.
Need a summons-specific action plan? For 039165125M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 42 Pleasant Valley Avenue, Staten Island, NY 10304 — not just the summons number
For this property, start with work without a permit and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work without a permit (3 source summonses): Work-without-permit hearing review and legalization/removal scope.
Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 8, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.