NYC DOB / ECB / OATH hearings · verified property resolution

455 East 92 Street, Brooklyn, NY 11212 — Work without a permit and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 455 East 92 Street, Brooklyn, NY 11212 and source-listed dates December 7, 2026, December 16, 2026. Recorded concerns include work without a permit, facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Work without a permitFacade / exterior wall safety

Verified premises, hearing and enforcement snapshot

Verified premises address
455 East 92 Street, Brooklyn, NY 11212
Borough
Brooklyn
BIN
3102520
BBL
3046890038
Source summonses
3
Hearing dates in source
December 7, 2026, December 16, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 1016 through 1024 WILLMOHR STREET; 455 EAST 92 STREET

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 455 East 92 Street, Brooklyn, NY 11212?

The uploaded record lists 3 summonses, including 039082201L (work without a permit), 039082202N (facade / exterior wall safety), 039185756R (work without a permit). The source-listed hearing dates: December 7, 2026, December 16, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39082201L
039082201L
8:30 AM
CLASS - 1Work without a permitPENDING
39082202N
039082202N
8:30 AM
CLASS - 1Facade / exterior wall safetyPENDING
39185756R
039185756R
8:30 AM
CLASS - 1Work without a permitPENDING

How the 3 recorded summonses relate at 455 East 92 Street, Brooklyn, NY 11212

The verified property matching links 3 distinct summonses to 455 East 92 Street, Brooklyn, NY 11212. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Work without a permit (2): source summons 039082201L, 039185756R. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Facade / exterior wall safety (1): source summons 039082202N. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list March 24, 2023 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

More than one source-listed hearing date: December 7, 2026, December 16, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Work without a permit — ECB/OATH summons 39082201L

Normalized ten-character lookup: 039082201L (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: roof or rooftop, structural framing, exterior masonry.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED PARAPET WALL AT EXPOSURE 1 ROOF TOP BEING SUPPORTED WITH A METAL BEAM SYSTEM BOLTED TO THE WALL AS A SUPPORT FOR LEANING TO THE PARAPET WALL, OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
March 24, 2023
Service date
March 24, 2023
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 455 East 92 Street, Brooklyn, NY 11212

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: roof or rooftop, structural framing, exterior masonry. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED PARAPET WALL AT EXPOSURE 1 ROOF TOP BEING SUPPORTED WITH A METAL BEAM SYSTEM BOLTED TO THE WALL AS A SUPPORT FOR LEANING TO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039082201L.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • approved framing plans and structural engineer assessment
  • photographs by elevation and facade professional repair reports
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039082201L, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 455 East 92 Street, Brooklyn, NY 11212
Summons 2 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39082202N

Normalized ten-character lookup: 039082202N (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: roof or rooftop, exterior masonry.

Inspector narrative as preserved in source data

AT TIME OF INSPECTION OBSERVED PARAPET WALL LEANING IN WARD AT EXPOSURE 1 ROOF TOP LEVEL. POSES AS A HAZARD., REPAIR AND/REPLACE

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
March 24, 2023
Service date
March 24, 2023
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 455 East 92 Street, Brooklyn, NY 11212

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: roof or rooftop, exterior masonry. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED PARAPET WALL LEANING IN WARD AT EXPOSURE 1 ROOF TOP LEVEL. POSES AS A HAZARD., REPAIR AND/REPLACE”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039082202N.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039082202N, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 455 East 92 Street, Brooklyn, NY 11212
Summons 3 of the source-linked property

Work without a permit — ECB/OATH summons 39185756R

Normalized ten-character lookup: 039185756R (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: exterior masonry.

Inspector narrative as preserved in source data

WORK WITHOUT A PERMIT..AT TIME OF INSPECTION OBSERVED AT EXT#1AND 4' OF EXP#2 PARAPET WALL HAS BEEN REPLACED ,NO PERMIT ON FILE WITH DOB AT TIME OF INSPECTION FOR THIS WORK., OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
April 23, 2026
Service date
April 23, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 455 East 92 Street, Brooklyn, NY 11212

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: exterior masonry. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT..AT TIME OF INSPECTION OBSERVED AT EXT#1AND 4' OF EXP#2 PARAPET WALL HAS BEEN REPLACED ,NO PERMIT ON FILE WITH DOB AT TIME OF INSPECT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039185756R.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs by elevation and facade professional repair reports
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039185756R, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 455 East 92 Street, Brooklyn, NY 11212
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 455 East 92 Street, Brooklyn, NY 11212 — not just the summons number

For this property, start with work without a permit and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Work without a permit (2 source summonses): Work-without-permit hearing review and legalization/removal scope.
  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 7, 2026, December 16, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.