NYC DOB / ECB / OATH hearings · verified property resolution

511 West 151 Street, Manhattan, NY 10031 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 1 DOB/ECB/OATH summons with 511 West 151 Street, Manhattan, NY 10031 and source-listed date December 24, 2026. Recorded concerns include facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safety

Verified premises, hearing and enforcement snapshot

Verified premises address
511 West 151 Street, Manhattan, NY 10031
Borough
Manhattan
BIN
1062188
BBL
1020830026
Source summonses
1
Hearing dates in source
December 24, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 511 through 513 WEST 151 STREET

Premises precision: Official building range; low endpoint shown. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 511 West 151 Street, Manhattan, NY 10031?

The uploaded record lists 1 summons, including 035718914R (facade / exterior wall safety). The source-listed hearing date: December 24, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
35718914R
035718914R
8:30 AM
CLASS - 2Facade / exterior wall safetyPENDING

How this recorded summons relates at 511 West 151 Street, Manhattan, NY 10031

This page documents one source-linked summons (035718914R), concerning facade / exterior wall safety. There is no second December summons in this dataset to connect to it. Check the complete DOB property record separately for earlier or later allegations, open correction items or related agency orders.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 35718914R

Normalized ten-character lookup: 035718914R (infraction 202)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: cellar or basement area, apartment or dwelling unit, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT IS A 5-STORY PLUS BASEMENT BUILDING WITH MULTIPLE DWELLING USE ON AN INTERIOR LOT. SEMI-DETACHED AT EXP 2. BRICK MASONRY FACADE WITH STONE SILLS.

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 20, 2026
Service date
October 20, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 511 West 151 Street, Manhattan, NY 10031

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: cellar or basement area, apartment or dwelling unit, exterior masonry. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT IS A 5-STORY PLUS BASEMENT BUILDING WITH MULTIPLE DWELLING USE ON AN INTERIOR LOT. SEMI-DE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035718914R.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated cellar/basement photos and approved basement floor plan
  • approved unit layout and relevant lawful occupancy records
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035718914R, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 511 West 151 Street, Manhattan, NY 10031
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 511 West 151 Street, Manhattan, NY 10031 — not just the summons number

For this property, start with facade / exterior wall safety. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.

What to send for an assessment: Bring the original summons, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 24, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.