5993 Strickland Avenue, Brooklyn, NY 11234 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 1 DOB/ECB/OATH summons with 5993 Strickland Avenue, Brooklyn, NY 11234 and source-listed date December 9, 2026. Recorded concerns include facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safety

Verified premises, hearing and enforcement snapshot

Verified premises address
5993 Strickland Avenue, Brooklyn, NY 11234
Borough
Brooklyn
BIN
3343226
BBL
3084701052
Source summonses
1
Hearing dates in source
December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 5993 STRICKLAND AVENUE; 6093 STRICKLAND AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 5993 Strickland Avenue, Brooklyn, NY 11234?

The uploaded record lists 1 summons, including 035730145N (facade / exterior wall safety). The source-listed hearing date: December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
35730145N
035730145N
8:30 AM
CLASS - 1Facade / exterior wall safetyPENDING

How this recorded summons relates at 5993 Strickland Avenue, Brooklyn, NY 11234

This page documents one source-linked summons (035730145N), concerning facade / exterior wall safety. There is no second December summons in this dataset to connect to it. Check the complete DOB property record separately for earlier or later allegations, open correction items or related agency orders.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 35730145N

Normalized ten-character lookup: 035730145N (infraction 102)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: structural framing, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AS NOTED: AT TIME OF INSPECTION ON A 1 STORY BUILDING WITH BRICK AND CMU BLOCK MASONRY STRUCTURE. OBSERVED HORIZONTAL AND VERTICAL CRACKS AFTER CODE AT VAR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 5, 2026
Service date
October 5, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 5993 Strickland Avenue, Brooklyn, NY 11234

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: structural framing, exterior masonry. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AS NOTED: AT TIME OF INSPECTION ON A 1 STORY BUILDING WITH BRICK AND CMU BLOCK MASONRY STRUCTURE. OB…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035730145N.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035730145N, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 5993 Strickland Avenue, Brooklyn, NY 11234
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 5993 Strickland Avenue, Brooklyn, NY 11234 — not just the summons number

For this property, start with facade / exterior wall safety. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.

What to send for an assessment: Bring the original summons, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 9, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.