The November 10, 2026 verified-property dataset associates 10 DOB/ECB/OATH summonses with 700 Grand Concourse, Bronx, NY 10451 and source-listed date December 18, 2026. Recorded concerns include fire escape / exit obstruction, fire alarm / sprinkler / suppression, illegal occupancy / certificate of occupancy and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Fire escape / exit obstructionFire alarm / sprinkler / suppressionIllegal occupancy / certificate of occupancyFacade / exterior wall safetyCertificate of Correction / order noncomplianceWork without a permit

Verified premises, hearing and enforcement snapshot

Verified premises address
700 Grand Concourse, Bronx, NY 10451
Borough
Bronx
BIN
2002780
BBL
2024580006
Source summonses
10
Hearing dates in source
December 18, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 700 GRAND CONCOURSE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 700 Grand Concourse, Bronx, NY 10451?

The uploaded record lists 10 summonses, including 035686071Y (fire escape / exit obstruction), 035686072X (fire alarm / sprinkler / suppression), 039184003H (facade / exterior wall safety), 039184004J (illegal occupancy / certificate of occupancy) and additional tickets. The source-listed hearing date: December 18, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
35686071Y
035686071Y
8:30 AM
CLASS - 1Fire escape / exit obstructionPENDING
35686072X
035686072X
8:30 AM
CLASS - 2Fire alarm / sprinkler / suppressionPENDING
39184003H
039184003H
8:30 AM
CLASS - 1Facade / exterior wall safetyPENDING
39184004J
039184004J
8:30 AM
CLASS - 1Illegal occupancy / certificate of occupancyPENDING
39184005L
039184005L
8:30 AM
CLASS - 1Illegal occupancy / certificate of occupancyPENDING
39184006N
039184006N
8:30 AM
CLASS - 1Certificate of Correction / order noncompliancePENDING
39184007P
039184007P
8:30 AM
CLASS - 1Fire alarm / sprinkler / suppressionPENDING
39184008R
039184008R
8:30 AM
CLASS - 2Fire escape / exit obstructionPENDING
39184009Z
039184009Z
8:30 AM
CLASS - 1Work without a permitPENDING
39184041Z
039184041Z
8:30 AM
CLASS - 1Vacate or padlock orderPENDING

How the 10 recorded summonses relate at 700 Grand Concourse, Bronx, NY 10451

The verified property matching links 10 distinct summonses to 700 Grand Concourse, Bronx, NY 10451. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Fire alarm / sprinkler / suppression (2): source summons 035686072X, 039184007P. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Fire escape / exit obstruction (2): source summons 035686071Y, 039184008R. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Illegal occupancy / certificate of occupancy (2): source summons 039184004J, 039184005L. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Certificate of Correction / order noncompliance (1): source summons 039184006N. Check this charge separately, even when its documents can be gathered with other property records.

Facade / exterior wall safety (1): source summons 039184003H. Check this charge separately, even when its documents can be gathered with other property records.

Vacate or padlock order (1): source summons 039184041Z. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039184009Z. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 9 summonses list April 9, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Potential shared workstream: Identify whether an earlier unpermitted-work condition underlies a later failure-to-certify charge. Legalizing the work alone may not close the separate correction-order record.

Potential shared workstream: The same approved floor plan may be relevant to lawful occupancy and means of egress; removing an exit obstruction does not automatically legalize an extra dwelling unit.

Potential shared workstream: First identify the operative vacate or padlock order and affected rooms; correcting a unit-use allegation is not the same as formally lifting a restriction.

Potential shared workstream: If a project altered the same route of exit, the permit review and egress correction may require one coordinated plan; establish that connection from the approved plans and cited locations.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 35686071Y

Normalized ten-character lookup: 035686071Y (infraction 127)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN AN OBSTRUCTED FIRE PASSAGEWAY. SECONDARY EXITS ARELOCKED AND BOLTED SHUT. STAIRCASES ARE OBSTRUCTED WITH MATERIALS WITHIN THE POULTRY SHOP, AND WINDOWS IN THE STAIRCASES ARE BOARDED UP. AT E

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 127 — 27-369,BC 1020.2 FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN AN OBSTRUCTED FIRE PASSAGEWAY. SECONDARY EXITS ARELOCKED AND BOLTED SHUT. STAIRCASES ARE OBSTRUCTED WITH MATERIALS WITHIN THE POULTRY S…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035686071Y.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035686071Y, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 700 Grand Concourse, Bronx, NY 10451
Summons 2 of the source-linked property

Fire alarm / sprinkler / suppression — ECB/OATH summons 35686072X

Normalized ten-character lookup: 035686072X (infraction 255)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges a deficiency in fire detection, alarm, sprinkler or suppression equipment. Key locations/components named in the source: fire-protection system.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN A FUNCTIONAL FIRE SUPPRESSION SYSTEM. THE SYSTEM IS NOT OPERATIONAL AS THE PRESSURE GAUGE READS ZERO, INDICATING IT IS NEITHER CHARGED NOR PRESSURIZED. THE PREMISES, INCLUDING THE TIRE SERVI

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 255 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: LACK OF A SYSTE
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 2
Source violation type
Plumbing
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Identify which system, floor or occupancy is cited; check whether it was required and what installation, maintenance, testing or sign-off was missing at inspection. Key locations/components named in the source: fire-protection system. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN A FUNCTIONAL FIRE SUPPRESSION SYSTEM. THE SYSTEM IS NOT OPERATIONAL AS THE PRESSURE GAUGE READS ZERO, INDICATING IT IS NEITHER CHARGED…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 035686072X.

  • Whether the listed system was legally required for the approved use and occupancy
  • Whether accepted fire-protection plans, test reports or system inspections cover the issue
  • Whether the inspector described the correct system, equipment and location
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Treat functional fire-safety defects as urgent and obtain qualified inspection.
  • Coordinate any needed FDNY/DOB permits, licensed fire-safety contractor corrections, tests and acceptance paperwork.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • fire-system test certificates and approved system drawings
  • approved fire-protection/alarm plans and permits
  • system inspection, service and acceptance test reports
  • contractor invoices and before/after dated equipment photos
  • FDNY or DOB notices and agency sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 035686072X, Building Violation LLC can scope fire-protection summons review and licensed-contractor compliance coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire alarm / sprinkler / suppression at 700 Grand Concourse, Bronx, NY 10451
Summons 3 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39184003H

Normalized ten-character lookup: 039184003H (infraction 106)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: roof or rooftop, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN THE BUILDING FACADE. MULTIPLE DEFECTS OBSERVED AT ALL EXPOSURES, INCLUDING CRACKS AND BULGING AT THE PENTHOUSE ROOF LEVEL. HOLES ARE PRESENT THROUGHOUT. RAILING MISSING AT EXPOSURE 1 ROOF LE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: roof or rooftop, exterior masonry. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN THE BUILDING FACADE. MULTIPLE DEFECTS OBSERVED AT ALL EXPOSURES, INCLUDING CRACKS AND BULGING AT THE PENTHOUSE ROOF LEVEL. HOLES ARE PR…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184003H.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184003H, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 700 Grand Concourse, Bronx, NY 10451
Summons 4 of the source-linked property

Illegal occupancy / certificate of occupancy — ECB/OATH summons 39184004J

Normalized ten-character lookup: 039184004J (infraction 103)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: rear exposure or yard, garage or parking area.

Inspector narrative as preserved in source data — potentially incomplete

OCCUPANCY IS CONTRARY TO CERTIFICATE OF OCCUPANCY (C OF O) NO. 49614. THE PREMISES IS CURRENTLY BEING UTILIZED AS A SLAUGHTERHOUSE (LIVE POULTRY SHOP), TIRE SHOP, AND A PARKING GARAGE AT THE REAR. HOWEVER, THE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 103 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: rear exposure or yard, garage or parking area. Record-specific inspection detail: Inspector text begins: “OCCUPANCY IS CONTRARY TO CERTIFICATE OF OCCUPANCY (C OF O) NO. 49614. THE PREMISES IS CURRENTLY BEING UTILIZED AS A SLAUGHTERHOUSE (LIVE POULTRY SHOP), TIR…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184004J.

  • Whether the cited space and alleged use match the actual premises and inspection period
  • Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
  • Whether the described occupants, partitioning or unit configuration existed at the relevant time
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
  • Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • rear-exposure photos tied to the inspection date
  • parking/site-plan approvals and photos of the cited use
  • current and historical Certificates of Occupancy or DOB occupancy records
  • approved floor plans, unit-count and building-use documentation
  • dated floor/interior photographs and credible usage records
  • lease or occupancy documents appropriately redacted
  • professional survey/architectural assessment and permit history

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184004J, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.

Request help with illegal occupancy / certificate of occupancy at 700 Grand Concourse, Bronx, NY 10451
Summons 5 of the source-linked property

Illegal occupancy / certificate of occupancy — ECB/OATH summons 39184005L

Normalized ten-character lookup: 039184005L (infraction 106)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: signage.

Inspector narrative as preserved in source data — potentially incomplete

SIGN-OFF OF COMPLETED WORK HAS NOT BEEN OBTAINED. AT THE TIME OF INSPECTION, PORTIONS OF THE BUILDING WERE OBSERVED TO BE OCCUPIED AND OPERATING AS A LIVE POULTRY SHOP, CONTRARY TO THE CERTIFICATE OF OCCUPANCY

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 106 — 27-/28-/BC-MISC MISCELLANEOUS VIOLATIONS
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: signage. Record-specific inspection detail: Inspector text begins: “SIGN-OFF OF COMPLETED WORK HAS NOT BEEN OBTAINED. AT THE TIME OF INSPECTION, PORTIONS OF THE BUILDING WERE OBSERVED TO BE OCCUPIED AND OPERATING AS A LIVE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184005L.

  • Whether the cited space and alleged use match the actual premises and inspection period
  • Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
  • Whether the described occupants, partitioning or unit configuration existed at the relevant time
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
  • Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • sign permit and dimensions/location photographs
  • current and historical Certificates of Occupancy or DOB occupancy records
  • approved floor plans, unit-count and building-use documentation
  • dated floor/interior photographs and credible usage records
  • lease or occupancy documents appropriately redacted
  • professional survey/architectural assessment and permit history

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184005L, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.

Request help with illegal occupancy / certificate of occupancy at 700 Grand Concourse, Bronx, NY 10451
Summons 6 of the source-linked property

Certificate of Correction / order noncompliance — ECB/OATH summons 39184006N

Normalized ten-character lookup: 039184006N (infraction 187)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges noncompliance with an earlier order or a requirement to submit correction documentation. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data

FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. REQUIRED ENGINEER'S REPORT REQUESTED ON 4/25/2023 UNDER DOB VIOLATION VIO23-01173 WAS NOT PROVIDED., COMPLY WITH COMMISSIONER'S ORDER

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 187 — 28-201.1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Trace this charge to the underlying summons or commissioner’s directive. A repair or hearing disposition is not necessarily the same as DOB accepting a required Certificate of Correction. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. REQUIRED ENGINEER'S REPORT REQUESTED ON 4/25/2023 UNDER DOB VIOLATION VIO23-01173 WAS NOT PROVIDED., COMPL…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184006N.

  • Whether a Certificate of Correction or other response was filed and accepted before the cited deadline
  • Whether the prior order references the correct premises and responsible party
  • Whether the earlier cited condition has been corrected and what current DOB closeout record shows
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Retrieve the original violation, deadline and agency compliance requirements.
  • Complete remaining physical remediation and submit the proper correction package with competent proof and required professional attestations.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • underlying summons, order and deadline notice
  • DOB Certificate of Correction filings and acknowledgments
  • before/after dated photographs and signed affidavits where required
  • contractor or licensed-professional invoices and sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184006N, Building Violation LLC can scope underlying-case research, correction paperwork and DOB compliance closeout after reviewing the actual notice and current DOB/OATH record.

Request help with certificate of correction / order noncompliance at 700 Grand Concourse, Bronx, NY 10451
Summons 7 of the source-linked property

Fire alarm / sprinkler / suppression — ECB/OATH summons 39184007P

Normalized ten-character lookup: 039184007P (infraction 1C1)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record alleges a deficiency in fire detection, alarm, sprinkler or suppression equipment. Key locations/components named in the source: fire-protection system.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO PERFORM A HYDROSTATIC PRESSURE TEST OF THE SPRINKLER SYSTEM. REVIEW OF FDNY RECORDS SINCE 1/14/25 INDICATES NO WATER-BASED FIRE PROTECTION SYSTEM IN PLACE. FAILURE TO CONDUCT REQUIRED INITIAL AND PER

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1C1 — BC 1704.21.1 (2008 CODE) & BC 1704.23.1 (2014 CODE) FAILURE TO PERFORM SUCCESSFUL HYDROSTATIC PRESSURE TEST OF SPRINKLER S
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 1
Source violation type
Plumbing
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Identify which system, floor or occupancy is cited; check whether it was required and what installation, maintenance, testing or sign-off was missing at inspection. Key locations/components named in the source: fire-protection system. Record-specific inspection detail: Inspector text begins: “FAILURE TO PERFORM A HYDROSTATIC PRESSURE TEST OF THE SPRINKLER SYSTEM. REVIEW OF FDNY RECORDS SINCE 1/14/25 INDICATES NO WATER-BASED FIRE PROTECTION SYSTE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184007P.

  • Whether the listed system was legally required for the approved use and occupancy
  • Whether accepted fire-protection plans, test reports or system inspections cover the issue
  • Whether the inspector described the correct system, equipment and location
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Treat functional fire-safety defects as urgent and obtain qualified inspection.
  • Coordinate any needed FDNY/DOB permits, licensed fire-safety contractor corrections, tests and acceptance paperwork.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • fire-system test certificates and approved system drawings
  • approved fire-protection/alarm plans and permits
  • system inspection, service and acceptance test reports
  • contractor invoices and before/after dated equipment photos
  • FDNY or DOB notices and agency sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184007P, Building Violation LLC can scope fire-protection summons review and licensed-contractor compliance coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire alarm / sprinkler / suppression at 700 Grand Concourse, Bronx, NY 10451
Summons 8 of the source-linked property

Fire escape / exit obstruction — ECB/OATH summons 39184008R

Normalized ten-character lookup: 039184008R (infraction 226)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The record concerns obstructed, missing or noncompliant means of egress, exit access or fire escape. Key locations/components named in the source: door or exit route.

Inspector narrative as preserved in source data — potentially incomplete

ILLEGAL HARDWARE INSTALLED ON EXIT DOORS, INCLUDING BOLTS APPLIED FROM THE EXTERIOR, COMPROMISING THE REQUIRED SECOND MEANS OF EGRESS AND PREVENTING SAFE AND UNOBSTRUCTED EMERGENCY EXIT., PROVIDE LEGAL HARDWARE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 226 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: USE OF PROHIBIT
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Locate the specific stair, corridor, exit door, fire escape or second means of egress. The analysis turns on the applicable building use, required path and conditions visible on the inspection date. Key locations/components named in the source: door or exit route. Record-specific inspection detail: Inspector text begins: “ILLEGAL HARDWARE INSTALLED ON EXIT DOORS, INCLUDING BOLTS APPLIED FROM THE EXTERIOR, COMPROMISING THE REQUIRED SECOND MEANS OF EGRESS AND PREVENTING SAFE A…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184008R.

  • Whether the cited route is a required exit component for this occupancy
  • Whether the alleged objects, locks or configuration actually affected required egress at the cited location
  • Whether the area and date are accurately identified and whether correction can be documented
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Remove hazards and restore required safe egress immediately.
  • When the issue is structural or involves doors, stairs, partitions or layout, use an appropriate professional and permits to establish lawful correction.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • door/exit photographs and approved egress plans
  • photographs of the exact door, stair, hall, landing or fire escape
  • approved floor and means-of-egress plans
  • repair/removal invoices and dated completion photographs
  • fire-escape or professional inspection and compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184008R, Building Violation LLC can scope life-safety hearing preparation and egress correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire escape / exit obstruction at 700 Grand Concourse, Bronx, NY 10451
Summons 9 of the source-linked property

Work without a permit — ECB/OATH summons 39184009Z

Normalized ten-character lookup: 039184009Z (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: roof or rooftop, garage or parking area, structural framing, air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data — potentially incomplete

WORK WITHOUT PERMIT OBSERVED FOR SPLIT A/C AND MECHANICAL SYSTEMS INSTALLED AT ROOF LEVEL. PARKING GARAGE LOCATED AT EXPOSURE 3 WITH VEHICLE LIFTS AND ATTENDANT STATION. ADDITIONAL STRUCTURE/STATION AFFIXED TO

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
April 9, 2026
Service date
April 9, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: roof or rooftop, garage or parking area, structural framing, air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT PERMIT OBSERVED FOR SPLIT A/C AND MECHANICAL SYSTEMS INSTALLED AT ROOF LEVEL. PARKING GARAGE LOCATED AT EXPOSURE 3 WITH VEHICLE LIFTS AND ATTE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184009Z.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • parking/site-plan approvals and photos of the cited use
  • approved framing plans and structural engineer assessment
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184009Z, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 700 Grand Concourse, Bronx, NY 10451
Summons 10 of the source-linked property

Vacate or padlock order — ECB/OATH summons 39184041Z

Normalized ten-character lookup: 039184041Z (infraction 1F9)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB describes a possible violation of a vacate/closure order or related premises-access restriction. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF INSPECTION, THE BUSINESSES KNOWN AS FELICIANO FLAT FIX AND RANA LIVE POULTRY WERE OBSERVED TO BE OPEN AND OPERATING TO THE PUBLIC. HOWEVER, A VACATE ORDER HAD BEEN ISSUED ON APRIL 9, 2026, WHICH

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1F9 — 28-207.4 FAILURE TO OBEY A VACATE ORDER
Issue date
April 10, 2026
Service date
April 10, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 700 Grand Concourse, Bronx, NY 10451

Obtain the original vacate, closure or padlock order and identify the affected rooms, floors or premises. The issue is whether the condition and access described in this summons match the operative order and its effective dates. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION, THE BUSINESSES KNOWN AS FELICIANO FLAT FIX AND RANA LIVE POULTRY WERE OBSERVED TO BE OPEN AND OPERATING TO THE PUBLIC. HOWEVER…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039184041Z.

  • Whether the order was active and applied to the exact cited premises at the inspection date
  • Whether the reported occupancy, access or use occurred as described
  • Whether an agency lift, modification, written permission or other record predates the inspection
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Do not rely on a hearing alone to lift a vacate or padlock order. Confirm the active agency restriction and required remedy.
  • Document that the prohibited occupancy or access has ceased, and arrange any required permits, inspections, corrections and formal agency lift.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • original vacate/padlock order and service history
  • agency correspondence, modification or lifting documents
  • dated photographs and occupant/access records for the cited areas
  • approved plans, permits and inspections supporting the corrective work

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039184041Z, Building Violation LLC can scope vacate-order research, hearing response and a coordinated order-lift/correction plan after reviewing the actual notice and current DOB/OATH record.

Request help with vacate or padlock order at 700 Grand Concourse, Bronx, NY 10451
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 700 Grand Concourse, Bronx, NY 10451 — not just the summons number

For this property, start with fire escape / exit obstruction and 6 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Fire escape / exit obstruction (2 source summonses): Life-safety hearing preparation and egress correction coordination.
  • Fire alarm / sprinkler / suppression (2 source summonses): Fire-protection summons review and licensed-contractor compliance coordination.
  • Illegal occupancy / certificate of occupancy (2 source summonses): Occupancy/illegal-conversion research, hearing preparation and design-professional coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 18, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.