NYC DOB / ECB / OATH hearings · verified property resolution

799 8 Avenue, Manhattan, NY 10019 — Facade / exterior wall safety and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 2 DOB/ECB/OATH summonses with 799 8 Avenue, Manhattan, NY 10019 and source-listed date December 3, 2026. Recorded concerns include facade / exterior wall safety, unpermitted electrical work. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Facade / exterior wall safetyUnpermitted electrical work

Verified premises, hearing and enforcement snapshot

Verified premises address
799 8 Avenue, Manhattan, NY 10019
Borough
Manhattan
BIN
1025144
BBL
1010390032
Source summonses
2
Hearing dates in source
December 3, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 300 through 302 WEST 49 STREET; 799 through 813 8 AVENUE

Premises precision: Official building range; low endpoint shown; multiple aliases. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 799 8 Avenue, Manhattan, NY 10019?

The uploaded record lists 2 summonses, including 039559511M (facade / exterior wall safety), 039205827K (unpermitted electrical work). The source-listed hearing date: December 3, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559511M
039559511M
9:30 AM
CLASS - 2Facade / exterior wall safetyPENDING
39205827K
039205827K
10:30 AM
CLASS - 2Unpermitted electrical workADMIT/IN-VIO

How the 2 recorded summonses relate at 799 8 Avenue, Manhattan, NY 10019

The verified property matching links 2 distinct summonses to 799 8 Avenue, Manhattan, NY 10019. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Facade / exterior wall safety (1): source summons 039559511M. Check this charge separately, even when its documents can be gathered with other property records.

Unpermitted electrical work (1): source summons 039205827K. Check this charge separately, even when its documents can be gathered with other property records.

Mixed procedural statuses: ADMIT/IN-VIO: 1; PENDING: 1. Confirm the present status and decision for each ticket before preparing one combined response.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39559511M

Normalized ten-character lookup: 039559511M (infraction 223)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: sidewalk shed, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OF 8 STORY MIXED USE BUILDING WITH PERMITTED SIDEWALK SHED IN PLACE FOR FACADE WORK WITHOUT REQUIRED EXTENSION CAUSING EXTREMELY HAZARDOUS CONDITIONS TO 304 W 49 ST AND PUBLIC DUE TO OPEN

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 223 — BC 3307.6,27-1021 SIDEWALK SHED DOES NOT MEET CODE SPECIFICATIONS
Issue date
September 23, 2026
Service date
September 23, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$6,000.00
Balance field in extract
$6,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 799 8 Avenue, Manhattan, NY 10019

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: sidewalk shed, exterior masonry. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OF 8 STORY MIXED USE BUILDING WITH PERMITTED SIDEWALK SHED IN PLACE FOR FACADE WORK WITHOUT REQUIRED EXTENSION CAUSING EXTREMELY HAZA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559511M.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • shed permit and contractor maintenance report
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559511M, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 799 8 Avenue, Manhattan, NY 10019
Summons 2 of the source-linked property

Unpermitted electrical work — ECB/OATH summons 39205827K

Normalized ten-character lookup: 039205827K (infraction 2C4)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges electrical work or equipment without a required electrical permit or compliant installation. Key locations/components named in the source: electrical installation.

Inspector narrative as preserved in source data

I OBSERVED INSTALLATION OF TWO ILLUMINATED SIGNS "MIXUE" WITH AN APPROXIMATELY DIMENSIONS OF 1.(L10'XW2'XH4') 2.(L1'XW4"XH2') WITHOUT AN ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 2C4 — 27-3018(B) ELECTRICAL WORK WITHOUT A PERMIT
Issue date
September 28, 2026
Service date
September 28, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
ADMIT/IN-VIO
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$0.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 799 8 Avenue, Manhattan, NY 10019

Identify the circuits, panels, wiring or devices actually cited and review the electrical filing/inspection record for the original installation date. Key locations/components named in the source: electrical installation. Record-specific inspection detail: Inspector text begins: “I OBSERVED INSTALLATION OF TWO ILLUMINATED SIGNS "MIXUE" WITH AN APPROXIMATELY DIMENSIONS OF 1.(L10'XW2'XH4') 2.(L1'XW4"XH2') WITHOUT AN ELECTRICAL PERMIT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039205827K.

  • Whether the cited work required an electrical permit at the relevant time
  • Whether a licensed electrician had already filed, inspected or signed off the cited work
  • Whether the described installation is correctly located and attributed
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Have safety-sensitive wiring or service conditions reviewed by a qualified licensed electrician.
  • If needed, arrange appropriate permits, inspections, repairs or removal and obtain required DOB closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • licensed electrician report and electrical filing history
  • electrical permit/job history and inspection results
  • licensed electrician invoices, test reports and sign-offs
  • dated photos of panels, circuits or fixtures referenced
  • approved electrical drawings and DOB correspondence

Outcome-style status in source: what to verify before acting

The extract records an in-violation/admission or similar disposition entry. Verify the written decision, payment and compliance obligations; do not treat the December date as proof of an upcoming contested hearing.

Need a summons-specific action plan? For 039205827K, Building Violation LLC can scope electrical-summons hearing support and licensed-electrician filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with unpermitted electrical work at 799 8 Avenue, Manhattan, NY 10019
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 799 8 Avenue, Manhattan, NY 10019 — not just the summons number

For this property, start with facade / exterior wall safety and 1 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.
  • Unpermitted electrical work (1 source summons): Electrical-summons hearing support and licensed-electrician filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 3, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.