NYC DOB / ECB / OATH hearings · verified property resolution

924 Metropolitan Avenue, Brooklyn, NY 11211 — Unsafe condition / maintenance and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 6 DOB/ECB/OATH summonses with 924 Metropolitan Avenue, Brooklyn, NY 11211 and source-listed date December 9, 2026. Recorded concerns include unsafe condition / maintenance, work without a permit, facade / exterior wall safety and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Unsafe condition / maintenanceWork without a permitFacade / exterior wall safetyElectrical safety / service equipmentFire alarm / sprinkler / suppression

Verified premises, hearing and enforcement snapshot

Verified premises address
924 Metropolitan Avenue, Brooklyn, NY 11211
Borough
Brooklyn
BIN
3400362
BBL
3029170007
Source summonses
6
Hearing dates in source
December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 924 through 930 METROPOLITAN AVENUE

Premises precision: Official building range; low endpoint shown. A verified building-level match does not prove an exact apartment or entrance.

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 924 Metropolitan Avenue, Brooklyn, NY 11211?

The uploaded record lists 6 summonses, including 039206088K (unsafe condition / maintenance), 039206091L (work without a permit), 039206089M (facade / exterior wall safety), 039206092N (electrical safety / service equipment) and additional tickets. The source-listed hearing date: December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39206088K
039206088K
8:30 AM
CLASS - 2Unsafe condition / maintenancePENDING
39206091L
039206091L
8:30 AM
CLASS - 1Work without a permitPENDING
39206089M
039206089M
9:30 AM
CLASS - 1Facade / exterior wall safetyPENDING
39206092N
039206092N
9:30 AM
CLASS - 1Electrical safety / service equipmentPENDING
39206087Z
039206087Z
10:30 AM
CLASS - 1Unsafe condition / maintenancePENDING
39206090J
039206090J
10:30 AM
CLASS - 1Fire alarm / sprinkler / suppressionPENDING

How the 6 recorded summonses relate at 924 Metropolitan Avenue, Brooklyn, NY 11211

The verified property matching links 6 distinct summonses to 924 Metropolitan Avenue, Brooklyn, NY 11211. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Unsafe condition / maintenance (2): source summons 039206088K, 039206087Z. These charges may share a single technical investigation or corrected condition only if the actual cited locations and inspection facts match.

Electrical safety / service equipment (1): source summons 039206092N. Check this charge separately, even when its documents can be gathered with other property records.

Facade / exterior wall safety (1): source summons 039206089M. Check this charge separately, even when its documents can be gathered with other property records.

Fire alarm / sprinkler / suppression (1): source summons 039206090J. Check this charge separately, even when its documents can be gathered with other property records.

Work without a permit (1): source summons 039206091L. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 6 summonses list September 29, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Unsafe condition / maintenance — ECB/OATH summons 39206088K

Normalized ten-character lookup: 039206088K (infraction 269)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: FAILURE TO COMPLY WITH LAW FOR DRAINAGE SYSTEM PER PC 702.1; 27-911. ATOI OBSERVED ON THE ROOF IMPROPER DRAINAGE SYSTEM, ROOF NOT PITCHED TO ALLOW FOR PROP

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 269 — 28-301.1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:FAILURE TO COMPL
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 2
Source violation type
Plumbing
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$625.00
Balance field in extract
$625.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 924 Metropolitan Avenue, Brooklyn, NY 11211

A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: FAILURE TO COMPLY WITH LAW FOR DRAINAGE SYSTEM PER PC 702.1; 27-911. ATOI OBSERVED ON THE ROOF IMPRO…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206088K.

  • Whether the exact physical condition and location existed on the inspection date
  • Whether the cited component and applicable maintenance standard were correctly identified
  • Whether repairs, inspections or other contemporaneous records change the factual assessment
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
  • Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • time-stamped photographs of the specific alleged condition
  • maintenance and repair tickets, invoices and professional findings
  • prior complaints, reports and permit history where relevant
  • dated post-correction photographs and agency compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206088K, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.

Request help with unsafe condition / maintenance at 924 Metropolitan Avenue, Brooklyn, NY 11211
Summons 2 of the source-linked property

Work without a permit — ECB/OATH summons 39206091L

Normalized ten-character lookup: 039206091L (infraction 101)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: apartment or dwelling unit.

Inspector narrative as preserved in source data

WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED IN APT. 201 OBSERVED A WALL INSTALLED IN THE LIVING ROOM SUB DIVIDING THE SPACE WITH OUT PERMIT, OBTAIN PERMIT

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 101 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 924 Metropolitan Avenue, Brooklyn, NY 11211

Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: apartment or dwelling unit. Record-specific inspection detail: Inspector text begins: “WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED IN APT. 201 OBSERVED A WALL INSTALLED IN THE LIVING ROOM SUB DIVIDING THE SPACE WITH OUT PERMIT, OBTA…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206091L.

  • Whether the work identified in the summons actually took place at the cited premises
  • Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
  • Whether the named respondent or owner had the responsibility alleged under the cited provision
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
  • Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved unit layout and relevant lawful occupancy records
  • historical DOB NOW/BIS permits, applications, approvals and sign-offs
  • approved architectural or engineering plans and amendments
  • dated photographs of the exact cited work or area
  • contracts, invoices and contractor or tenant work records
  • permit or restoration evidence and final inspections

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206091L, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.

Request help with work without a permit at 924 Metropolitan Avenue, Brooklyn, NY 11211
Summons 3 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39206089M

Normalized ten-character lookup: 039206089M (infraction 104)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: roof or rooftop.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT TIME OF INSPECTION OBSERVED CRACKS IN BUILDING EFIS, DAMAGED METAL CLADDING , BROKEN FLOOR TILES ON ROOF FLOOR DAMAGED FENCING ON ROOFS, DAMAGED METAL R

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 104 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$5,000.00
Balance field in extract
$5,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 924 Metropolitan Avenue, Brooklyn, NY 11211

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: roof or rooftop. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT TIME OF INSPECTION OBSERVED CRACKS IN BUILDING EFIS, DAMAGED METAL CLADDING , BROKEN FLOOR TILES…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206089M.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • dated roof photographs and any roofing/equipment permit documents
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206089M, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 924 Metropolitan Avenue, Brooklyn, NY 11211
Summons 4 of the source-linked property

Electrical safety / service equipment — ECB/OATH summons 39206092N

Normalized ten-character lookup: 039206092N (infraction 1D2)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: stairs or landings, electrical installation.

Inspector narrative as preserved in source data — potentially incomplete

UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. ATIO OBSERVED BURNED OUT OUTLET IN BEDROOM, LIGHT FIXTURE IN THE STAIRCASE 3RD FLOOR HANGING BY THE

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 1D2 — EC 110.2(A) UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT OR WIRING IN USE
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,600.00
Balance field in extract
$1,600.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 924 Metropolitan Avenue, Brooklyn, NY 11211

Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: stairs or landings, electrical installation. Record-specific inspection detail: Inspector text begins: “UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT, APPARATUS, MATERIALS, DEVICES, APPLIANCES OR WIRING IN USE. ATIO OBSERVED BURNED OUT OUTLET IN BEDROOM…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206092N.

  • Whether the cited component, clearance or unsafe condition existed as described
  • Whether the equipment met the applicable requirements and was inspected/maintained
  • Whether the notice identified the correct location and owner responsibility
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
  • Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • stair/landing measurements and dated photos or approved egress plans
  • licensed electrician report and electrical filing history
  • electrical service and panel photographs with location
  • licensed electrician safety evaluation and invoices
  • electrical permits, inspections and test reports
  • equipment specification or maintenance and repair records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206092N, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.

Request help with electrical safety / service equipment at 924 Metropolitan Avenue, Brooklyn, NY 11211
Summons 5 of the source-linked property

Unsafe condition / maintenance — ECB/OATH summons 39206087Z

Normalized ten-character lookup: 039206087Z (infraction 102)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

DOB alleges a failure to maintain a building component in code-compliant or safe condition. Key locations/components named in the source: air-conditioning or mechanical equipment.

Inspector narrative as preserved in source data — potentially incomplete

FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI OBSERVED DAMAGED SHEET ROCK IN SEVERAL LOCATIONS , SIGNS OF WATER LEAKAGE OBSERVED THROUGHOUT BUILDING, DAMAGED FLOOR BOARDS, INADEQUATELY SIZED A/C'S

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 102 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 924 Metropolitan Avenue, Brooklyn, NY 11211

A general maintenance law citation is not the actual defect: the condition is the specific item described in the inspector narrative, which must be examined with photographs and repair records. Key locations/components named in the source: air-conditioning or mechanical equipment. Record-specific inspection detail: Inspector text begins: “FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI OBSERVED DAMAGED SHEET ROCK IN SEVERAL LOCATIONS , SIGNS OF WATER LEAKAGE OBSERVED THROUGHOUT B…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206087Z.

  • Whether the exact physical condition and location existed on the inspection date
  • Whether the cited component and applicable maintenance standard were correctly identified
  • Whether repairs, inspections or other contemporaneous records change the factual assessment
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct unsafe conditions and protect affected occupants or the public without waiting for a hearing.
  • Choose appropriate repair professionals/permits, verify whether reinspection or Certificate of Correction is needed, and retain proof.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • equipment photos and licensed installation/permit evidence
  • time-stamped photographs of the specific alleged condition
  • maintenance and repair tickets, invoices and professional findings
  • prior complaints, reports and permit history where relevant
  • dated post-correction photographs and agency compliance records

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206087Z, Building Violation LLC can scope building-maintenance hearing review and documented correction closeout after reviewing the actual notice and current DOB/OATH record.

Request help with unsafe condition / maintenance at 924 Metropolitan Avenue, Brooklyn, NY 11211
Summons 6 of the source-linked property

Fire alarm / sprinkler / suppression — ECB/OATH summons 39206090J

Normalized ten-character lookup: 039206090J (infraction 1Q2)

November 10 source-listed hearing10:30 AM

Source allegation and actual cited law

The record alleges a deficiency in fire detection, alarm, sprinkler or suppression equipment. Key locations/components named in the source: fire-protection system.

Inspector narrative as preserved in source data

FAIL TO MAINTAIN - FIRE ALARM. AT TIME OF INSPECTION FIRE ALARM RANDOMLY COMES ON AND SHOWS SYSTEM FAULTS AND RESETS IT SELF, COMPLY WITH CODE.

This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.

Recorded infraction numbers and cited legal provisions:
  • 1Q2
Issue date
September 29, 2026
Service date
September 29, 2026
Source severity
CLASS - 1
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 924 Metropolitan Avenue, Brooklyn, NY 11211

Identify which system, floor or occupancy is cited; check whether it was required and what installation, maintenance, testing or sign-off was missing at inspection. Key locations/components named in the source: fire-protection system. Record-specific inspection detail: Inspector text begins: “FAIL TO MAINTAIN - FIRE ALARM. AT TIME OF INSPECTION FIRE ALARM RANDOMLY COMES ON AND SHOWS SYSTEM FAULTS AND RESETS IT SELF, COMPLY WITH CODE.”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039206090J.

  • Whether the listed system was legally required for the approved use and occupancy
  • Whether accepted fire-protection plans, test reports or system inspections cover the issue
  • Whether the inspector described the correct system, equipment and location
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Treat functional fire-safety defects as urgent and obtain qualified inspection.
  • Coordinate any needed FDNY/DOB permits, licensed fire-safety contractor corrections, tests and acceptance paperwork.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • fire-system test certificates and approved system drawings
  • approved fire-protection/alarm plans and permits
  • system inspection, service and acceptance test reports
  • contractor invoices and before/after dated equipment photos
  • FDNY or DOB notices and agency sign-offs

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039206090J, Building Violation LLC can scope fire-protection summons review and licensed-contractor compliance coordination after reviewing the actual notice and current DOB/OATH record.

Request help with fire alarm / sprinkler / suppression at 924 Metropolitan Avenue, Brooklyn, NY 11211
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 924 Metropolitan Avenue, Brooklyn, NY 11211 — not just the summons number

For this property, start with unsafe condition / maintenance and 4 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Unsafe condition / maintenance (2 source summonses): Building-maintenance hearing review and documented correction closeout.
  • Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 9, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.