NYC DOB / ECB / OATH hearings · verified property resolution

942 Atlantic Avenue, Brooklyn, NY 11238 — Site safety / construction operations and December 2026 OATH Hearing Details

The November 10, 2026 verified-property dataset associates 3 DOB/ECB/OATH summonses with 942 Atlantic Avenue, Brooklyn, NY 11238 and source-listed dates December 2, 2026, December 9, 2026. Recorded concerns include site safety / construction operations, construction fence / site protection, facade / exterior wall safety. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.

Site safety / construction operationsConstruction fence / site protectionFacade / exterior wall safety

Verified premises, hearing and enforcement snapshot

Verified premises address
942 Atlantic Avenue, Brooklyn, NY 11238
Borough
Brooklyn
BIN
3027508
BBL
3011240020
Source summonses
3
Hearing dates in source
December 2, 2026, December 9, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN

Official PAD aliases and building ranges: 942 ATLANTIC AVENUE

Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.

What merits immediate verification: one or more Class 1 source allegations; one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.

What is the December 2026 OATH hearing for at 942 Atlantic Avenue, Brooklyn, NY 11238?

The uploaded record lists 3 summonses, including 039559813H (site safety / construction operations), 039559814J (construction fence / site protection), 039560055X (facade / exterior wall safety). The source-listed hearing dates: December 2, 2026, December 9, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.

What should the owner or respondent do first?

Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.

December 2026 summonses and listed hearing times

Summons / lookupSource hearing date / timeSeverityRecorded subjectSource disposition
39559813H
039559813H
8:30 AM
CLASS - 2Site safety / construction operationsPENDING
39559814J
039559814J
9:30 AM
CLASS - 2Construction fence / site protectionPENDING
39560055X
039560055X
8:30 AM
CLASS - 1Facade / exterior wall safetyPENDING

How the 3 recorded summonses relate at 942 Atlantic Avenue, Brooklyn, NY 11238

The verified property matching links 3 distinct summonses to 942 Atlantic Avenue, Brooklyn, NY 11238. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.

Construction fence / site protection (1): source summons 039559814J. Check this charge separately, even when its documents can be gathered with other property records.

Facade / exterior wall safety (1): source summons 039560055X. Check this charge separately, even when its documents can be gathered with other property records.

Site safety / construction operations (1): source summons 039559813H. Check this charge separately, even when its documents can be gathered with other property records.

Shared source issue date: 2 summonses list September 27, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.

More than one source-listed hearing date: December 2, 2026, December 9, 2026. Do not treat one appearance or adjournment as disposing of every summons; confirm each date separately.

Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.

Each violation: allegation, defense issues, correction strategy and supporting documents

Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.

Summons 1 of the source-linked property

Site safety / construction operations — ECB/OATH summons 39559813H

Normalized ten-character lookup: 039559813H (infraction 2P7)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited item concerns safety practices, documentation, supervision or housekeeping at a construction site. The exact cited location/component should be confirmed against the original inspection record.

Inspector narrative as preserved in source data — potentially incomplete

BC 3303.4.2 AT THE TIME OF INSPECTION, DUMPSTER CONTAINER OBSERVED IN THE STREET AT EXPOSURE 1 FULL (ABOVE THE BRIM) WITH INADEQUATE COVERING OR PROTECTIVE MEASURES CREATING A HAZARDOUS CONDITIONS FOR BOTH PED

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 2P7
Issue date
September 27, 2026
Service date
September 27, 2026
Source severity
CLASS - 2
Source violation type
Unknown
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 942 Atlantic Avenue, Brooklyn, NY 11238

Identify the exact construction operation, site location, plan, log, posting, supervision or housekeeping requirement the inspector lists. The exact cited location/component should be confirmed against the original inspection record. Record-specific inspection detail: Inspector text begins: “BC 3303.4.2 AT THE TIME OF INSPECTION, DUMPSTER CONTAINER OBSERVED IN THE STREET AT EXPOSURE 1 FULL (ABOVE THE BRIM) WITH INADEQUATE COVERING OR PROTECTIVE…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559813H.

  • Whether construction was underway and the cited safety duty applied at the relevant time
  • Whether required postings, logs, plans or supervision were in place
  • Whether the cited conditions or documents belonged to this job site and respondent
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Correct active site hazards immediately and involve the qualified site safety/contractor team.
  • Update required plans, safety controls, postings, inspections or records and document remediation.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site safety plan, permits and approved construction documents
  • daily inspection logs, toolbox talks and supervisory assignments
  • dated job-site photos with exposure or floor
  • contractor correction records and agency inspection reports

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559813H, Building Violation LLC can scope construction safety hearing preparation and contractor/site-safety coordination after reviewing the actual notice and current DOB/OATH record.

Request help with site safety / construction operations at 942 Atlantic Avenue, Brooklyn, NY 11238
Summons 2 of the source-linked property

Construction fence / site protection — ECB/OATH summons 39559814J

Normalized ten-character lookup: 039559814J (infraction 211)

November 10 source-listed hearing9:30 AM

Source allegation and actual cited law

The alleged condition involves a construction fence, site enclosure or required pedestrian protection. Key locations/components named in the source: construction fence or enclosure.

Inspector narrative as preserved in source data — potentially incomplete

AT THE TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE AROUND JOBSITE PERIMETER NOT MAINTAINED IN ACCORDANCE WITH BC 3307.7. FENCE PANELS COVERED WITH MULTIPLE GRAFFITI & ADVERTISING POSTERS UNRELATED TO THE JO

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 211 — BC 3307.7,27-1021(C) JOB SITE FENCE NOT CONSTRUCTED PURSUANT TO SUBSECTION
Issue date
September 27, 2026
Service date
September 27, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,000.00
Balance field in extract
$1,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

What the alleged violation means at 942 Atlantic Avenue, Brooklyn, NY 11238

Compare the exact fence opening, location, dimensions or protection feature described with approved safety plans and site conditions at the time of inspection. Key locations/components named in the source: construction fence or enclosure. Record-specific inspection detail: Inspector text begins: “AT THE TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE AROUND JOBSITE PERIMETER NOT MAINTAINED IN ACCORDANCE WITH BC 3307.7. FENCE PANELS COVERED WITH MULT…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039559814J.

  • Whether the cited condition existed at the exact exposure or location alleged
  • Whether the protection system and permit met the requirements applicable to this site
  • Whether contemporaneous site or contractor records contradict or contextualize the alleged defect
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Address unsafe public access or exposed hazards immediately.
  • Repair or replace required fences, barriers, signage or site protection and secure any associated permits/inspection evidence.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • site-fence photos, dimensions and inspection log
  • site safety or construction fence drawings/permits
  • dated photographs showing the cited exposure and dimensions
  • daily inspection logs and contractor repair tickets
  • documented reinspection or sign-off where required

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039559814J, Building Violation LLC can scope site-safety violation response and fence/protection correction coordination after reviewing the actual notice and current DOB/OATH record.

Request help with construction fence / site protection at 942 Atlantic Avenue, Brooklyn, NY 11238
Summons 3 of the source-linked property

Facade / exterior wall safety — ECB/OATH summons 39560055X

Normalized ten-character lookup: 039560055X (infraction 109)

November 10 source-listed hearing8:30 AM

Source allegation and actual cited law

The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: structural framing, exterior masonry.

Inspector narrative as preserved in source data — potentially incomplete

AT TIME OF INSPECTION OBSERVED: INADEQUATE/NO WEATHERPROOF AT EXPOSURE# 2 FACADE OF ADJOINING PROPERTY 944 ATLANTIC AVE. CRACKS, JOIST POCKETS NOT FILLED IN, LOSE BRICKS, IMPACTING THE STRUCTURE OF ADJOINING PR

The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.

Recorded infraction numbers and cited legal provisions:
  • 109 — BC 3301.2,27-1009(A) FAIL TO SAFEGUARD PERS/PROPERTY AFFECTED BY CONSTRUCTION OP
Issue date
October 1, 2026
Service date
October 2, 2026
Source severity
CLASS - 1
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$10,000.00
Balance field in extract
$10,000.00

Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.

Safety priority: Class 1 in source — treat any alleged immediately hazardous condition as urgent; verify specific DOB correction requirements.

What the alleged violation means at 942 Atlantic Avenue, Brooklyn, NY 11238

Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: structural framing, exterior masonry. Record-specific inspection detail: Inspector text begins: “AT TIME OF INSPECTION OBSERVED: INADEQUATE/NO WEATHERPROOF AT EXPOSURE# 2 FACADE OF ADJOINING PROPERTY 944 ATLANTIC AVE. CRACKS, JOIST POCKETS NOT FILLED I…”

Possible defense questions and factual disputes to investigate

The following are issues to verify, not assurances that a defense applies to summons 039560055X.

  • Whether the specific facade element or inspection/report obligation was correctly identified
  • Whether applicable inspection or FISP filings were submitted and accepted on time
  • Whether a protective shed, hazard notice or unsafe-condition order applies separately
  • Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.

Correction and DOB closeout strategy

  • Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
  • Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.

Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.

Evidence and documents tailored to this allegation

  • approved framing plans and structural engineer assessment
  • photographs by elevation and facade professional repair reports
  • facade/critical-examination reports, amendments and acceptance receipts
  • photographs with elevation/exposure labels and dated repair records
  • QEW or design professional evaluations and DOB correspondence
  • sidewalk shed or protection documentation if relevant

Pending in source: what to verify before acting

The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.

Need a summons-specific action plan? For 039560055X, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.

Request help with facade / exterior wall safety at 942 Atlantic Avenue, Brooklyn, NY 11238
Focused NYC DOB and OATH resolution services

Resolve the actual issue at 942 Atlantic Avenue, Brooklyn, NY 11238 — not just the summons number

For this property, start with site safety / construction operations and 2 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.

  • Site safety / construction operations (1 source summons): Construction safety hearing preparation and contractor/site-safety coordination.
  • Construction fence / site protection (1 source summons): Site-safety violation response and fence/protection correction coordination.
  • Facade / exterior wall safety (1 source summons): Facade summons and FISP/repair-filing coordination.

What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing dates: December 2, 2026, December 9, 2026.

Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.

Official NYC verification resources

Verify the current OATH / DOB record

This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.