97-29 134 Street, Queens, NY 11419 — Work without a permit and December 2026 OATH Hearing Details
The November 10, 2026 verified-property dataset associates 4 DOB/ECB/OATH summonses with 97-29 134 Street, Queens, NY 11419 and source-listed date December 29, 2026. Recorded concerns include work without a permit, facade / exterior wall safety, illegal occupancy / certificate of occupancy and other allegations. Below are the exact source identifiers and allegations, followed by issue-specific defense checks, correction options and evidence needed for a responsible review.
Work without a permitFacade / exterior wall safetyIllegal occupancy / certificate of occupancyElectrical safety / service equipment
Verified premises, hearing and enforcement snapshot
Verified premises address
97-29 134 Street, Queens, NY 11419
Borough
Queens
BIN
4200415
BBL
4094830049
Source summonses
4
Hearing dates in source
December 29, 2026
Source snapshot
November 10, 2026
Address verification method
PAD exact BIN
Official PAD aliases and building ranges: 97-29 134 STREET
Source and authorship: Building Violation LLC prepared this independent property-record explanation using a November 10, 2026 DOB/OATH source extract and verified BIN/BBL property matching. The issue analysis is editorial guidance generated from source allegations and cited laws, not a new inspection or legal determination. The source sometimes abbreviates inspector text. This is not a live OATH calendar; verify dates, appearance instructions, dispositions, monetary fields and compliance directly with NYC.
What merits immediate verification: one or more possibly shortened inspector narratives. Read the current OATH and DOB records before acting.
What is the December 2026 OATH hearing for at 97-29 134 Street, Queens, NY 11419?
The uploaded record lists 4 summonses, including 039208607M (work without a permit), 039208608Y (facade / exterior wall safety), 039208606K (illegal occupancy / certificate of occupancy), 039208609X (electrical safety / service equipment). The source-listed hearing date: December 29, 2026. These are allegations and dated extract fields; the current official notices determine the actual appearance obligation and disposition.
What should the owner or respondent do first?
Verify the status of each normalized summons with OATH, obtain the complete inspector narrative and cited order/permit records, address immediate hazards, and assemble dated evidence matched to each allegation. A Certificate of Correction or other DOB closeout may remain necessary even after an OATH hearing or payment.
How the 4 recorded summonses relate at 97-29 134 Street, Queens, NY 11419
The verified property matching links 4 distinct summonses to 97-29 134 Street, Queens, NY 11419. They may share a property and documents, but the dataset does not establish that they arose from one inspection, one condition or one respondent. Review each summons independently.
Electrical safety / service equipment (1): source summons 039208609X. Check this charge separately, even when its documents can be gathered with other property records.
Facade / exterior wall safety (1): source summons 039208608Y. Check this charge separately, even when its documents can be gathered with other property records.
Illegal occupancy / certificate of occupancy (1): source summons 039208606K. Check this charge separately, even when its documents can be gathered with other property records.
Work without a permit (1): source summons 039208607M. Check this charge separately, even when its documents can be gathered with other property records.
Shared source issue date: 4 summonses list October 19, 2026 as their issue date. Compare inspection times, sites and inspector observations before deciding whether they are factually connected.
Coordination checklist: build one property evidence folder with a separate subfolder, hearing/disposition verification and correction tracking sheet for each normalized summons number. Share drawings or photos across tickets only when the same physical facts are documented.
Each violation: allegation, defense issues, correction strategy and supporting documents
Source wording is distinguished from potential actions. These are investigatory prompts, not legal advice, guaranteed defenses or promises of DOB acceptance.
Summons 1 of the source-linked property
Work without a permit — ECB/OATH summons 39208607M
DOB alleges construction, alteration, demolition or installation work without a required permit. Key locations/components named in the source: cellar or basement area, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED AT CELLAR LEVEL WATER & WASTE LINE WAS INSTALLED FOR SHOWER STALL CREATING A THREE PIECE BATHROOM. ALT 1 APP # 400833684 (SCHEDULE B) INDICATES ONLY A TWO PIECE BATHROOM(TOILET & SINK)., OBTAIN ALL PER
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
201 — 28-105.1 WORK WITHOUT A PERMIT
Issue date
October 19, 2026
Service date
October 20, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 97-29 134 Street, Queens, NY 11419
Determine which physical work is alleged, when it was performed and whether an approved filing/permit covered that scope at inspection. A permit issued after the inspection does not by itself establish that the charge was invalid when issued. Key locations/components named in the source: cellar or basement area, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “OBSERVED AT CELLAR LEVEL WATER & WASTE LINE WAS INSTALLED FOR SHOWER STALL CREATING A THREE PIECE BATHROOM. ALT 1 APP # 400833684 (SCHEDULE B) INDICATES ON…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208607M.
Whether the work identified in the summons actually took place at the cited premises
Whether the work was exempt, previously permitted, or covered by approved plans at the relevant time
Whether the named respondent or owner had the responsibility alleged under the cited provision
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Confirm which work can lawfully remain and whether legalization, permits or removal/restoration is necessary.
Have a registered architect, engineer or licensed trade assess design, safety, permitting and inspection requirements as appropriate.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
approved wet-room layouts and plumbing/alteration permits
historical DOB NOW/BIS permits, applications, approvals and sign-offs
approved architectural or engineering plans and amendments
dated photographs of the exact cited work or area
contracts, invoices and contractor or tenant work records
permit or restoration evidence and final inspections
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039208607M, Building Violation LLC can scope work-without-permit hearing review and legalization/removal scope after reviewing the actual notice and current DOB/OATH record.
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: front exposure.
Inspector narrative as preserved in source data
OBSERVED AT FRONT YARD BROKEN & MISSING CONCRETE SLAB CREATING AN OPEN POCKET/HOLE., MAINTAIN EXTERIOR BUILDING WALL
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
204 — 28-302.1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES
Issue date
October 19, 2026
Service date
October 20, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$2,500.00
Balance field in extract
$2,500.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 97-29 134 Street, Queens, NY 11419
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: front exposure. Record-specific inspection detail: Inspector text begins: “OBSERVED AT FRONT YARD BROKEN & MISSING CONCRETE SLAB CREATING AN OPEN POCKET/HOLE., MAINTAIN EXTERIOR BUILDING WALL”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208608Y.
Whether the specific facade element or inspection/report obligation was correctly identified
Whether applicable inspection or FISP filings were submitted and accepted on time
Whether a protective shed, hazard notice or unsafe-condition order applies separately
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
front-exposure photos showing the area alleged
facade/critical-examination reports, amendments and acceptance receipts
photographs with elevation/exposure labels and dated repair records
QEW or design professional evaluations and DOB correspondence
sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039208608Y, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
The alleged use or dwelling-unit arrangement may differ from the Certificate of Occupancy or other lawful DOB records. Key locations/components named in the source: cellar or basement area, kitchen or bathroom.
Inspector narrative as preserved in source data — potentially incomplete
OBSERVED THE CELLAR LEVEL IS CONVERTED & OCCUPIED INTO SLEEPING QUARTERS WITH THREE PIECE BATHROOM, BED, REFRIGERATOR, FOOD ITEMS, HEATER, CLOTHING & PERSONAL ITEMS. ATL 1 APP # 400833684 INDICATES CELLAR LEVEL
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
Recorded infraction numbers and cited legal provisions:
203 — 28-118.3.2 OCC CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS
Issue date
October 19, 2026
Service date
October 20, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 97-29 134 Street, Queens, NY 11419
Verify the legally approved building use, number of units and affected floor, then compare those records to the exact occupancy described by the inspector. Do not assume a unit is lawful or unlawful based only on a mailing address. Key locations/components named in the source: cellar or basement area, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “OBSERVED THE CELLAR LEVEL IS CONVERTED & OCCUPIED INTO SLEEPING QUARTERS WITH THREE PIECE BATHROOM, BED, REFRIGERATOR, FOOD ITEMS, HEATER, CLOTHING & PERSO…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208606K.
Whether the cited space and alleged use match the actual premises and inspection period
Whether a valid Certificate of Occupancy, letter of no objection or approved plans authorize that use
Whether the described occupants, partitioning or unit configuration existed at the relevant time
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
If a hazardous or illegal occupancy exists, address safe occupancy and egress promptly.
Discuss restoration to approved use versus a potentially approvable legalization with a registered design professional; coordinate applications, inspections and closeout if viable.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
approved wet-room layouts and plumbing/alteration permits
current and historical Certificates of Occupancy or DOB occupancy records
approved floor plans, unit-count and building-use documentation
dated floor/interior photographs and credible usage records
lease or occupancy documents appropriately redacted
professional survey/architectural assessment and permit history
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039208606K, Building Violation LLC can scope occupancy/illegal-conversion research, hearing preparation and design-professional coordination after reviewing the actual notice and current DOB/OATH record.
DOB cites the condition, clearance, maintenance or safety of electrical service equipment or wiring. Key locations/components named in the source: cellar or basement area, electrical installation, kitchen or bathroom.
Inspector narrative as preserved in source data
OBSERVED AT CELLAR LEVEL ELECTRICAL BREAKER PANEL BOX IS OPEN AND EXPOSED WITH NO PROTECTIVE COVER PLUS ELECTRICAL BOX IN BATHROOM IS OPEN WITH EXPOSED ELECTRICAL WIRING., REPAIR AND/OR REPLACE
This is the narrative supplied in the dataset; verify it against the actual signed summons and inspector attachments.
Recorded infraction numbers and cited legal provisions:
202 — 28-301.1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER
Issue date
October 19, 2026
Service date
October 20, 2026
Source severity
CLASS - 2
Source violation type
Construction
Hearing status in extract
PENDING
DOB/ECB status in extract
ACTIVE
Correction certification in extract
Not recorded
Penalty field in extract
$1,250.00
Balance field in extract
$1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
Record-specific resolution analysis — not an OATH finding
What the alleged violation means at 97-29 134 Street, Queens, NY 11419
Identify whether the allegation concerns a switchboard, meter room, panel, wiring, exposed energized equipment or electrical service and distinguish a safety deficiency from unpermitted new work. Key locations/components named in the source: cellar or basement area, electrical installation, kitchen or bathroom. Record-specific inspection detail: Inspector text begins: “OBSERVED AT CELLAR LEVEL ELECTRICAL BREAKER PANEL BOX IS OPEN AND EXPOSED WITH NO PROTECTIVE COVER PLUS ELECTRICAL BOX IN BATHROOM IS OPEN WITH EXPOSED ELE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208609X.
Whether the cited component, clearance or unsafe condition existed as described
Whether the equipment met the applicable requirements and was inspected/maintained
Whether the notice identified the correct location and owner responsibility
Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
Secure unsafe equipment or exposed wiring with a licensed electrician promptly.
Repair or replace components as needed and document proper inspection, electrical filings and compliance closeout.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
dated cellar/basement photos and approved basement floor plan
licensed electrician report and electrical filing history
approved wet-room layouts and plumbing/alteration permits
electrical service and panel photographs with location
licensed electrician safety evaluation and invoices
electrical permits, inspections and test reports
equipment specification or maintenance and repair records
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039208609X, Building Violation LLC can scope electrical maintenance summons analysis and licensed-trade remediation after reviewing the actual notice and current DOB/OATH record.
Resolve the actual issue at 97-29 134 Street, Queens, NY 11419 — not just the summons number
For this property, start with work without a permit and 3 additional issue categories. Building Violation LLC can assess an authorized paid scope for OATH hearing preparation/representation, source-record research and correction coordination appropriate to the individual allegations. A hearing defense and a DOB compliance closeout may both be necessary.
Work without a permit (1 source summons): Work-without-permit hearing review and legalization/removal scope.
Illegal occupancy / certificate of occupancy (1 source summons): Occupancy/illegal-conversion research, hearing preparation and design-professional coordination.
What to send for an assessment: Bring the original summonses, current OATH notices, available DOB records and photos tied to the alleged condition. The source-listed hearing date: December 29, 2026.
Services may require separate licensed-trade, architect/engineer or attorney involvement. No outcome, penalty reduction, permit or agency approval is guaranteed; professional fees and scope are confirmed before work.
This is a point-in-time source extract, not a live court calendar. Confirm the date, appearance method, hearing status, penalties and correction requirements directly with the government before taking action.
Important: This private-service page is not affiliated with NYC OATH or DOB, does not establish guilt or innocence and is not legal advice. Building Violation LLC may provide authorized non-attorney OATH representation and violation-resolution coordination within its permitted scope. Different proceedings can require an attorney or licensed professional. The source field named PENALITY_IMPOSED is shown for transparency but does not prove a presently payable adjudicated amount.