Facade / exterior wall safety — ECB/OATH summons 39208152P
Normalized ten-character lookup: 039208152P (infraction 2G1)
Source allegation and actual cited law
The cited condition concerns exterior walls, facade elements, parapets or critical-examination obligations. Key locations/components named in the source: balcony or terrace, exterior masonry.
Inspector narrative as preserved in source data — potentially incomplete
ECB VIOLATION ISSUED FOR FAILURE TO FILE A FINAL INSPECTION OR SIGNED OFF PERMITTED WORK WITH DOB. ATOI OBSERVED, BALCONY SLAB EDGE RESTORATION AND FACADE WORK APPEARED COMPLETED WITH JOB APPLICATION # Q0085621
The supplied record stops at its extract limit and may omit the rest of the inspector narrative. Obtain the complete original summons before making a factual or legal decision.
- 2G1 — 28-116.2.4.2 FAIL TO CONDUCT/FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEP
- Issue date
- October 16, 2026
- Service date
- October 16, 2026
- Source severity
- CLASS - 2
- Source violation type
- Construction
- Hearing status in extract
- PENDING
- DOB/ECB status in extract
- ACTIVE
- Correction certification in extract
- Not recorded
- Penalty field in extract
- $1,250.00
- Balance field in extract
- $1,250.00
Penalty and balance are fields in the supplied November 10 extract—not independently verified current fines, final adjudications or amounts presently owed.
What the alleged violation means at 98-23 Horace Harding Expressway, Queens, NY 11368
Separate physical hazards (such as loose masonry or appurtenances) from periodic report or amendment-filing allegations; the exact law references and notice determine the required response. Key locations/components named in the source: balcony or terrace, exterior masonry. Record-specific inspection detail: Inspector text begins: “ECB VIOLATION ISSUED FOR FAILURE TO FILE A FINAL INSPECTION OR SIGNED OFF PERMITTED WORK WITH DOB. ATOI OBSERVED, BALCONY SLAB EDGE RESTORATION AND FACADE…”
Possible defense questions and factual disputes to investigate
The following are issues to verify, not assurances that a defense applies to summons 039208152P.
- Whether the specific facade element or inspection/report obligation was correctly identified
- Whether applicable inspection or FISP filings were submitted and accepted on time
- Whether a protective shed, hazard notice or unsafe-condition order applies separately
- Compare the original summons, issue/service dates and the complete inspector narrative with each document; do not assume any potential defense is established without proof.
Correction and DOB closeout strategy
- Safeguard pedestrians and tenants promptly if a potentially unsafe exterior condition exists.
- Engage an appropriate registered design professional and qualified contractor for required assessments, repair plans, permits, filings and reinspections.
Determine whether DOB requires a Certificate of Correction, a separate reinspection, application/permit sign-off or an order-lift. An OATH outcome, a paid fine and physical correction are separate issues.
Evidence and documents tailored to this allegation
- balcony/terrace photos, waterproofing or structural records
- photographs by elevation and facade professional repair reports
- facade/critical-examination reports, amendments and acceptance receipts
- photographs with elevation/exposure labels and dated repair records
- QEW or design professional evaluations and DOB correspondence
- sidewalk shed or protection documentation if relevant
Pending in source: what to verify before acting
The November 10 extract lists the hearing as PENDING. Confirm its present scheduling, appearance method, adjournment/settlement rules and evidence deadlines directly with OATH.
Need a summons-specific action plan? For 039208152P, Building Violation LLC can scope facade summons and FISP/repair-filing coordination after reviewing the actual notice and current DOB/OATH record.
Request help with facade / exterior wall safety at 98-23 Horace Harding Expressway, Queens, NY 11368